Inspection & Maintenance
Before use, the product should be inspected for
visual defects using the checklist below:
Ensure all welds on the hub are free of cracks
or defects
Ensure levelling feet are not showing any signs
of deformation, corrosion or damage.
Ensure all adjustment pins are not distorted or
damaged. All pins shall be fully engaged before
using the product.
Ensure all bolts are correctly tightened and free
from excessive corrosion
Ensure all leg sections are free from indentation
Ensure the weight basket is retaining all weights *
Ensure the weight basket is fully engaged to the
tail before any lift.
Ensure the king pin for the Davit is fully engaged
in the hub before applying a load.
Check the Davit in accordance with its
corresponding Assembly & Operation Guide.
*Only applicable to the counterbalance system
.
Inspections are instigated by the user, the above list
covers the main components on this product, any
accessories and third-party components must be
inspected following the corresponding instructions.
Regular Inspections
To ensure that the product’s frame remains in safe
working order it must be inspected regularly by a
competent or qualified person. We recommend
inspections every 6 months for personnel lifting
and every 12 months for goods only, unless
local regulations, adverse working conditions or
profile of use and risk dictate shorter periods.
The components of the system frame need to be
checked for damage, wear, corrosion or other
irregularities. It may be necessary to disassemble the
system frame in order to do this. Particular attention
should be paid to checking the profiles for denting,
making sure there is no wear or elongation on the
bolt holes and ensuring that the trolley moves freely