REID LIFTING PORTA-DAVIT 500 Series Assembly & Operation Download Page 16

No. 1 in lightweight, portable, safe lifting solutions

16

OTHER VARIATIONS

PORTA

-DAVIT 350EX - Extended 

Operating Radius

The extended operating radius variants of the davit 
have two different components to the standard 

PORTA

-DAVIT 500 – a jib extension piece and an 

extended adjustment channel.

Follow steps 1 -3 and then as follows:

• 

Attach extended adjustment channel to upright 
tube using securing pin and R-clip.

• 

Insert the spigot of the jib extension piece into the 
lower jib tube.

• 

Continue from step 4

The extended adjustment channel must only be used in 
conjunction with a jib extension piece.

N.B.

 

PORTA

-DAVIT 350EX or other extended davits 

must not be used with a 

PORTA

-BASE mobile socket 

and must also not be used for personnel lifting or fall 

arrest applications.

PORTA

-DAVIT plus Socket Extension 

Assembly

The assembly process can generally be performed 
in two ways (Method A or Method B) depending on 
the height of the socket extension, socket used and 
whether there are any hazards adjacent to the socket 
position.

A risk assessment should be performed before 
starting the process, as the local situation needs to be 
carefully considered.

Method A - 2 People 

(Recommended)

1. 

Assemble 

PORTA

-DAVIT 500 or 

PORTA

-DAVIT 

350EX on the floor horizontally adjacent to the 
fixed socket position, and attach the chain block 
and slave chain to the shackles

2. 

Move jib arm in line with upright tube and tighten 
the retaining strap

3. 

Fit the socket extension to the davit kingpin so 
that the assembly is complete on the floor

4. 

Rotate the davit & socket extension assembly 
into a vertical position adjacent to the fixed 
socket

5. 

Two people should lift the davit & socket 
extension assembly, each using the socket 
handles with one hand and bracing against the 
davit with the other. Then insert the socket 
extension kingpin into the fixed socket

N.B. The davit + socket extension with chain block + 

slave chain weigh approximately 50kg.

6. 

With a shoulder against the lower jib tube, the 
retaining strap is released to its full extent and 
the davit arm allowed to rotate to full/set radius

7. 

The unit is now ready to be rotated into position 
to connect to the item to be lifted

N.B. If the fixed sockets are installed flush with 

ground level then the assembled unit can be “walked 

up” into position. The kingpin should be positioned 

and retained above the fixed socket when raising, so 

it naturally slides into the socket).

Summary of Contents for PORTA-DAVIT 500 Series

Page 1: ...Tel 44 0 1291 620796 www reidlifting com www reidlifting com Assembly Operation ASSEMBLY VIDEO...

Page 2: ...ENANCE Regular Inspections Maintenance Repair Storage and Transportation SOCKETS Socket Installation Verifying the Installation MARKING ATEX ATEX Classification ATEX Identification ATEX Spark Formatio...

Page 3: ...work with the PORTA DAVIT 500 must read the operation instructions and act accordingly Operation including preparation trouble shooting during operation and cleaning Maintenance inspection repair Tra...

Page 4: ...ft and lower loads up to its rated capacity The capacity indicated on the product is the maximum working load limit WLL or safe working load SWL which must not be exceeded definition is country depend...

Page 5: ...t use the davit if it does not rotate freely in the bearing or the bottom flange is fouled in any way preventing free rotation of the davit Do not knot or shorten the tension strap to reduce operating...

Page 6: ...uipment Regulations 1998 S I 1998 No 2306 EN795 2012 The Lifting Operations and Lifting Equipment Regulations 1998 S I 1998 No 2307 The safety regulations of the respective country for using manual li...

Page 7: ...in the bags provided When transporting the components the user must take note of the manual handling considerations SOCKETS The PORTA DAVIT 500 structure needs to be anchored to a surface foundation...

Page 8: ...tion has the ultimate capacities required Following initial socket installation verification tests we do not recommend overload tests for the socket or davit and suggest thorough visual examination on...

Page 9: ...use in Zone 1 Environments II 2 GD T6 IIdentification for protection against explosions II Unit group II non mining application 2 Category 2 High safety for use in Zone 1 GD For use in gas G dust D at...

Page 10: ...rging Additionally the kingpin should be checked to ensure it rotates freely and the lower bearing must be ensured to be fixed to the structure with no possibility of a build up of debris between the...

Page 11: ...is optional and the socket type may vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application N B No tools are required for assembly ASSEMBLY INSTRUCTIONS Glov...

Page 12: ...s in full contact with the socket flange N B Fits all REID Lifting socket types flush mount top mount side mount bridge mount and the PORTA BASE Demonstrated using a top mount socket 3 Loosen the reta...

Page 13: ...with a PORTA BASE mobile socket the pin must be inserted within the yellow zone which gives a maximum operating radius of 1000mm If used with fixed sockets any adjustment position can be used giving...

Page 14: ...version 2 Remove retaining pins and clips then feed winch rope hook end over sheaves The winch should not be attached at this point The winched option version of the davit has a rigid adjustment chann...

Page 15: ...to davit base with adjustment pin 6 Insert retaining clip through adjustment pin 7 Position winch on rigid adjustment channel and attach winch with retaining pins and clips Ensure winch rope is wound...

Page 16: ...situation needs to be carefully considered Method A 2 People Recommended 1 Assemble PORTA DAVIT 500 or PORTA DAVIT 350EX on the floor horizontally adjacent to the fixed socket position and attach the...

Page 17: ...jib arm in line with upright tube and tighten the retaining strap 4 Rotate the davit into a vertical position adjacent to the socket 5 Two people should lift the davit assembly 500mm and insert the ki...

Page 18: ...t names are trade marks of REID Lifting Ltd PORTA GANTRY PORTA GANTRY RAPIDE PORTA DAVIT PORTA BASE T DAVIT PORTA QUAD THE QUEEN S AWARDS FOR ENTERPRISE INTERNATIONAL TRADE 2018 QUALITY SAFETY E OE Qu...

Page 19: ...mbers found on product into table below A B C D INSPECTION RECORD INSPECTION Product number s A Serial number s B WLL C Year of manufacture D Name of user Date of purchase Date of first use Periodic E...

Page 20: ...E 33 0 297 53 32 99 33 0 297 53 04 86 contact reidlifting fr www reidlifting fr DE AUT CH REID Lifting D A CH Finkernstrasse 26 8280 Kreuzlingen SWITZERLAND 41 0 71 686 90 40 41 0 71 688 51 69 jesser...

Reviews: