REID LIFTING PORTA-DAVIT 500 Series Assembly & Operation Download Page 10

No. 1 in lightweight, portable, safe lifting solutions

10

ATEX - Inspection, Maintenance  

& Repair 

If using the davit in explosive atmospheres, in addition 
to the Regular Inspection/Maintenance information 
found on page 7, these additional instructions should 
be followed. 

Inspections shall be instigated by the user and occur 
at least 6 monthly or sooner if adverse operating 
conditions or profile of use dictate shorter periods. 
Inspections and maintenance shall be carried out at a 
safe distance away from an explosive atmosphere.

Special attention should be given to dust deposits on 
the structure, especially in areas where the profiles 
come into contact and should be wiped clean and 
care taken not to apply materials that could create 
electrostatic charging. Additionally the kingpin should 
be checked to ensure it rotates freely and the lower 
bearing must be ensured to be fixed to the structure 
with no possibility of a build-up of debris between the 
contact surfaces.

The structure is predominantly constructed from 
aluminium which will not rust. However there are 
steel components used throughout. These are the 
fasteners, shackles and sockets. Where there is 
sign of any rust deposits on the aluminium structure 
it should be wiped clean as above and where there 
is sign of rust on a steel component, then that 
component should be removed from use and the 
structure not used until a replacement is fitted.

LANGUAGE 

It is essential for the safety of the user that if this 
product is re-sold outside the original country of 
destination the reseller shall provide instructions 
for use, maintenance, for periodic examination and 
for repair in the language of the country in which the 
product is to be used.

Summary of Contents for PORTA-DAVIT 500 Series

Page 1: ...Tel 44 0 1291 620796 www reidlifting com www reidlifting com Assembly Operation ASSEMBLY VIDEO...

Page 2: ...ENANCE Regular Inspections Maintenance Repair Storage and Transportation SOCKETS Socket Installation Verifying the Installation MARKING ATEX ATEX Classification ATEX Identification ATEX Spark Formatio...

Page 3: ...work with the PORTA DAVIT 500 must read the operation instructions and act accordingly Operation including preparation trouble shooting during operation and cleaning Maintenance inspection repair Tra...

Page 4: ...ft and lower loads up to its rated capacity The capacity indicated on the product is the maximum working load limit WLL or safe working load SWL which must not be exceeded definition is country depend...

Page 5: ...t use the davit if it does not rotate freely in the bearing or the bottom flange is fouled in any way preventing free rotation of the davit Do not knot or shorten the tension strap to reduce operating...

Page 6: ...uipment Regulations 1998 S I 1998 No 2306 EN795 2012 The Lifting Operations and Lifting Equipment Regulations 1998 S I 1998 No 2307 The safety regulations of the respective country for using manual li...

Page 7: ...in the bags provided When transporting the components the user must take note of the manual handling considerations SOCKETS The PORTA DAVIT 500 structure needs to be anchored to a surface foundation...

Page 8: ...tion has the ultimate capacities required Following initial socket installation verification tests we do not recommend overload tests for the socket or davit and suggest thorough visual examination on...

Page 9: ...use in Zone 1 Environments II 2 GD T6 IIdentification for protection against explosions II Unit group II non mining application 2 Category 2 High safety for use in Zone 1 GD For use in gas G dust D at...

Page 10: ...rging Additionally the kingpin should be checked to ensure it rotates freely and the lower bearing must be ensured to be fixed to the structure with no possibility of a build up of debris between the...

Page 11: ...is optional and the socket type may vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application N B No tools are required for assembly ASSEMBLY INSTRUCTIONS Glov...

Page 12: ...s in full contact with the socket flange N B Fits all REID Lifting socket types flush mount top mount side mount bridge mount and the PORTA BASE Demonstrated using a top mount socket 3 Loosen the reta...

Page 13: ...with a PORTA BASE mobile socket the pin must be inserted within the yellow zone which gives a maximum operating radius of 1000mm If used with fixed sockets any adjustment position can be used giving...

Page 14: ...version 2 Remove retaining pins and clips then feed winch rope hook end over sheaves The winch should not be attached at this point The winched option version of the davit has a rigid adjustment chann...

Page 15: ...to davit base with adjustment pin 6 Insert retaining clip through adjustment pin 7 Position winch on rigid adjustment channel and attach winch with retaining pins and clips Ensure winch rope is wound...

Page 16: ...situation needs to be carefully considered Method A 2 People Recommended 1 Assemble PORTA DAVIT 500 or PORTA DAVIT 350EX on the floor horizontally adjacent to the fixed socket position and attach the...

Page 17: ...jib arm in line with upright tube and tighten the retaining strap 4 Rotate the davit into a vertical position adjacent to the socket 5 Two people should lift the davit assembly 500mm and insert the ki...

Page 18: ...t names are trade marks of REID Lifting Ltd PORTA GANTRY PORTA GANTRY RAPIDE PORTA DAVIT PORTA BASE T DAVIT PORTA QUAD THE QUEEN S AWARDS FOR ENTERPRISE INTERNATIONAL TRADE 2018 QUALITY SAFETY E OE Qu...

Page 19: ...mbers found on product into table below A B C D INSPECTION RECORD INSPECTION Product number s A Serial number s B WLL C Year of manufacture D Name of user Date of purchase Date of first use Periodic E...

Page 20: ...E 33 0 297 53 32 99 33 0 297 53 04 86 contact reidlifting fr www reidlifting fr DE AUT CH REID Lifting D A CH Finkernstrasse 26 8280 Kreuzlingen SWITZERLAND 41 0 71 686 90 40 41 0 71 688 51 69 jesser...

Reviews: