Ensure the pins are fully engaged on both sides.
Level the hub by adjusting the leveling feet and
check against the spirit level on the top of the
Central Hub.
Repeat step 14 for each of the Leveling Feet.
Insert the Davit into the Central Hub for use.
Note: Please refer to the Assembly & Operation
Guide of the applicable Davit system when used in
conjunction with the PORTA BASE.
Remove the first side plate from the storage
position at the bottom of the basket.
Insert the first side plate between the end plate
channels.
Ensure the side plate sits correctly over the pin.
Secure in place with the pins.
Repeat steps 7 - 10 for the second side plate.
Attach the basket to the tail and secure both sides
with pins.
25
PORTA
BASE
Ensure all pins are fully engaged
Assembly Instructions
13
16
14
15
Ensure all Leveling Feet are in contact with the surface so that
the load is evenly distributed.
Castors are for positioning purposes only and not suitable
for loading.
7
8
9
10
11
12