Regulus NBC 170 HP Installation And Operation Manual Download Page 8

 

 ©2019 We reserve the right to errors, changes and improvements without prior notice.

REGULUS spol. s r.o.

E-mail: [email protected]

Web: www.regulus.eu

v1.1-09/2020

8 - Maintenance

Clean the exterior of the tank with a wet cloth and a suitable detergent. 
Never use abrasives, solvents, petroleum-based products, etc.
Check for water leaks at the tank connection points.

9 - Disposal

Packaging shall be disposed of in compliance with the valid rules. When the product reaches the end of its 
life, it shall not be disposed of as household waste. It shall be dropped off at a Local Waste Recycling Centre. 
Insulation shall be recycled as plastic and the steel vessel as scrap iron.

10 - Warranty

This product is covered by warranty according to the conditions described in this Manual and according to the 
Warranty Certificate. A Warranty Certificate is an integral part of the supply.

Summary of Contents for NBC 170 HP

Page 1: ...www regulus eu NBC 170 HP NBC 170 HP EN Installation and Operation Manual HOT WATER STORAGE TANK NBC 170 HP...

Page 2: ...mal insulation 3 1 4 Connection points on the tank 3 1 5 Packaging 3 2 General Information 3 3 Technical Data and Dimensions of NBC 170 HP 4 4 Operation 6 5 Examples of Assigning Connection Points 6 6...

Page 3: ...U insulation white surface 1 4 Connection points on the tank 2 top with G 3 4 inner thread for the heating coil 2 top with G 3 4 inner thread for cold water inlet and hot water outlet 1 top for temper...

Page 4: ...s NBC 170 HP Hot Water Storage Tank code 17615 pos connections height mm W1 G 3 4 F 1060 mm W2 G 3 4 F 1060 mm W3 G 3 4 F 1060 mm X1 G 3 4 F 1060 mm X2 G 3 4 F 1060 mm C1 G 1 2 F 1060 mm A1 G 3 4 F 10...

Page 5: ...al Heat exchanger material Insulation material Insulation outer surface Tank diam Tank diam with insulation Total tank height Tipping height Empty weight 42 kg 1075 mm 1233 mm polyurethane PU Dimensio...

Page 6: ...perature should be set to 55 60 C This temperature guarantees the best operation and at the same time it prevents formation of Legionella bacteria 5 Examples of Assigning Connection Points Table of li...

Page 7: ...nk instead of the magnesium one 6 4 Commissioning Earth the tank before commissioning The earthing screw is located at the marked place Fill the entire system with liquids and air vent Check all conne...

Page 8: ...the tank connection points 9 Disposal Packaging shall be disposed of in compliance with the valid rules When the product reaches the end of its life it shall not be disposed of as household waste It s...

Reviews: