Regulus NBC 170 HP Installation And Operation Manual Download Page 6

│ 

6

NBC 170 HP - www.regulus.eu

4 - Operation

The tank is designed for operation in pressure circuits. Hot water is heated in the tank via the integrated heat 
exchanger (heating coil) from e.g. a heat pump.
Hot water temperature should be set to 55-60 °C. This temperature guarantees the best operation and at the 
same time, it prevents formation of Legionella bacteria.

5 - Examples of Assigning Connection Points

Table of limit values for total dissolved solids in hot water  

Description 

pH

Total dissolved 

solids (TDS)

Ca

Chlorides

Mg

Na

Fe

Max. value 

6.5 - 9.5

600 mg/l

40 mg/l

100 mg/l

20 mg/l

200 mg/l

0.2 mg/l

NBC 170 HP

CH                        HW Circ CW

Summary of Contents for NBC 170 HP

Page 1: ...www regulus eu NBC 170 HP NBC 170 HP EN Installation and Operation Manual HOT WATER STORAGE TANK NBC 170 HP...

Page 2: ...mal insulation 3 1 4 Connection points on the tank 3 1 5 Packaging 3 2 General Information 3 3 Technical Data and Dimensions of NBC 170 HP 4 4 Operation 6 5 Examples of Assigning Connection Points 6 6...

Page 3: ...U insulation white surface 1 4 Connection points on the tank 2 top with G 3 4 inner thread for the heating coil 2 top with G 3 4 inner thread for cold water inlet and hot water outlet 1 top for temper...

Page 4: ...s NBC 170 HP Hot Water Storage Tank code 17615 pos connections height mm W1 G 3 4 F 1060 mm W2 G 3 4 F 1060 mm W3 G 3 4 F 1060 mm X1 G 3 4 F 1060 mm X2 G 3 4 F 1060 mm C1 G 1 2 F 1060 mm A1 G 3 4 F 10...

Page 5: ...al Heat exchanger material Insulation material Insulation outer surface Tank diam Tank diam with insulation Total tank height Tipping height Empty weight 42 kg 1075 mm 1233 mm polyurethane PU Dimensio...

Page 6: ...perature should be set to 55 60 C This temperature guarantees the best operation and at the same time it prevents formation of Legionella bacteria 5 Examples of Assigning Connection Points Table of li...

Page 7: ...nk instead of the magnesium one 6 4 Commissioning Earth the tank before commissioning The earthing screw is located at the marked place Fill the entire system with liquids and air vent Check all conne...

Page 8: ...the tank connection points 9 Disposal Packaging shall be disposed of in compliance with the valid rules When the product reaches the end of its life it shall not be disposed of as household waste It s...

Reviews: