6 - Installation and Commissioning

Installation shall meet valid rules and may be done only by qualified staff. The tank shall be placed on the floor, 
as close to the heat source as possible.

Warning: Defects caused by improper installation, use or handling are not covered by warranty.

6.1 - Connection to heat sources 

Connect heating circuits to the inlet and outlet of the heating coil. The heat source connects to the tank using G 
3/4” fittings.

6.2 - Connection to water mains 

DHW piping shall be made according to valid rules. G 3/4” fittings are used to connect the tank to a cold water 
inlet and hot water outlet. A safety kit (code 17387) shall be installed at the cold water inlet. Installation of 
a reducing valve to the tank inlet is recommended. If the pressure from water mains exceeds 6 bar, a reducing 
valve is necessary. An 8-liter expansion tank shall be installed at the cold water inlet.
Should the water be too hard, install a water softener before the tank. In case the water contains mechanical 
impurities, install a strainer.
There is a drain valve at the lowest point of the tank. 
Complete DHW piping shall be properly insulated. 

6.3 - Electronic anode rod installation 

Magnesium anode rod is factory installed in the tank. An electronic anode rod (code 13793) can be installed in 
the tank instead of the magnesium one.

6.4 - Commissioning

Earth the tank before commissioning. 

The earthing screw is located at the marked place. Fill the entire 

system with liquids and air-vent. Check all connections for leaks and a system pressure.
The quality of top-up and heating water is set by ČSN 07 7401:1992.

 Hot water quality must meet the conditions 

shown in the Table of limit values for total dissolved solids in hot water, page 7 of this Manual.

It is recommended to maintain the temperature of the hot water in the tank, e.g. by means of a heat pump, in the 
temperature range of 48-52 °C. It is recommended to temporarily raise the temperature of the entire hot water 
system to 65-70 °C as a protection against the formation of bacteria, especially Legionella. It is recommended 
to carry out a temporary temperature increase whenever the hot water supply is shut down for a longer time. 
Requirements for the quality and temperature of hot water can be set by a special regulation according to the 
methods of hot water use (staff hygiene, hot water for hospitals, educational institutes, technological water, 
etc.).  Set  the  parameters  of  the  respective  controller  according  to  the  manufacturer‘s  documentation  and 
recommendations. Check regularly that all control and adjustment elements are functioning properly.

7 - Tank Insulation

Product description

Thermal  insulation  is  a component  of  tanks  that  prevents  heat  losses.  Thermal  insulation  of  EPU  with 
polyurethane foil is used.

Warning

Do not use open fire near the product.

Summary of Contents for NBC 170 HP

Page 1: ...www regulus eu NBC 170 HP NBC 170 HP EN Installation and Operation Manual HOT WATER STORAGE TANK NBC 170 HP...

Page 2: ...mal insulation 3 1 4 Connection points on the tank 3 1 5 Packaging 3 2 General Information 3 3 Technical Data and Dimensions of NBC 170 HP 4 4 Operation 6 5 Examples of Assigning Connection Points 6 6...

Page 3: ...U insulation white surface 1 4 Connection points on the tank 2 top with G 3 4 inner thread for the heating coil 2 top with G 3 4 inner thread for cold water inlet and hot water outlet 1 top for temper...

Page 4: ...s NBC 170 HP Hot Water Storage Tank code 17615 pos connections height mm W1 G 3 4 F 1060 mm W2 G 3 4 F 1060 mm W3 G 3 4 F 1060 mm X1 G 3 4 F 1060 mm X2 G 3 4 F 1060 mm C1 G 1 2 F 1060 mm A1 G 3 4 F 10...

Page 5: ...al Heat exchanger material Insulation material Insulation outer surface Tank diam Tank diam with insulation Total tank height Tipping height Empty weight 42 kg 1075 mm 1233 mm polyurethane PU Dimensio...

Page 6: ...perature should be set to 55 60 C This temperature guarantees the best operation and at the same time it prevents formation of Legionella bacteria 5 Examples of Assigning Connection Points Table of li...

Page 7: ...nk instead of the magnesium one 6 4 Commissioning Earth the tank before commissioning The earthing screw is located at the marked place Fill the entire system with liquids and air vent Check all conne...

Page 8: ...the tank connection points 9 Disposal Packaging shall be disposed of in compliance with the valid rules When the product reaches the end of its life it shall not be disposed of as household waste It s...

Reviews: