Regency® P33E-4 Zero Clearance Direct Vent Gas Fireplace
11
INSTALLATION
COMBUSTIBLE MANTELS
Because of the extreme heat this fi replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are
shown in the diagram below.
Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible
board.
This drawing is to scale at 1:6 (one inch = 6 inches). Mantel can be installed anywhere in shaded area or higher using the above scale.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.
Combustible mantel leg clearances as per diagrams below:
Drywall
Mantel Clearances
with Flush, Full Screens or Bay Glass
2
0
12
6
4
8
10
2
0
12
6
4
8
10
Side View
Top of
Unit
12" (305mm)
0” - 3-1/2" (89mm)
7-1/2"(191mm)
11"(279mm)
7"(178mm)
9"(229mm)
29"(737mm)
to floor
3"(76mm)
Standof
f
Mantel Clearances with
Contemporary Faceplate
Summary of Contents for P33E-4
Page 60: ...60 Regency P33E 4 Zero Clearance Direct Vent Gas Fireplace PARTS LIST ...
Page 64: ...64 Regency P33E 4 Zero Clearance Direct Vent Gas Fireplace NOTES ...
Page 65: ...Regency P33E 4 Zero Clearance Direct Vent Gas Fireplace 65 NOTES ...
Page 66: ...66 Regency P33E 4 Zero Clearance Direct Vent Gas Fireplace NOTES ...