background image

48

  | 

P33CE-10 Direct Vent Gas Fireplace

 

48

maintenance

Glass Gasket

 

If the glass gasket requires replacement use 

5/8" flat glass gasket for the Bay Front (Part 

# 936-243) and a tadpole glass gasket for the 

Flush Front (Part # 936-155). 

door Glass

Your Regency

®

 fireplace is supplied with high 

temperature, 5 mm Neoceram ceramic glass that 

will withstand the highest heat that your unit will 

produce.   If your glass requires cleaning, we 

recommend using an approved glass cleaner 

available at all authorized dealers. Do not use 

abrasive  materials.  Do  not  clean  the  glass 

when hot.

In the event that you break your glass by impact, 

purchase your replacement from an authorized 

Regency

®

 dealer only, and follow our step-by-

step instructions for replacement.

Flush Glass Replacement

Remove  the  flush  door  front.  Remove  the  4 

glass clips from each corner. Slide in the new 

replacement  glass.  Push  the  4  glass  clips 

back onto the frame.  

The glass must have 

gasketing around it.

Caution: Wear gloves when removing 

damaged or broken glass.

warninG

:  Do  not  operate  the 

appliance with the glass panels 

removed,  cracked  or  broken. 

Replacement of the glass  panels 

should be done by a licensed or 

qualified service person.

Summary of Contents for P33CE-LP10

Page 1: ...ther flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Leave the building immediately Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions If you cannot reach you gas supplier call the fire dep...

Page 2: ...you with all the warmth and charm of a wood fireplace at the flick of a switch The P33CE has been approved by Warnock Hersey Intertek for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many features of your Regenc...

Page 3: ...ational Fuel Gas Code ANSI Z223 1 and the current National Electrical Code ANSI NFPA 70 in the U S A and the cur rent CAN CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22 1 in Canada The appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian ...

Page 4: ...ss 48 Removing Valve 49 Installing Valve 49 Main Assembly 50 Burner Log Assembly 51 Warranty 55 Safety Label 5 Important Message 7 Before You Start 7 General Safety Information 7 Installation Checklist 8 Locating YOUR FIREPLACE 8 Duct System Option 8 Unit Dimensions 9 4 sided faceplate Dimensions 9 Clearances 10 Combustible Mantels 11 Mantel Leg Clearances 12 Framing Dimensions 13 Framing Finishin...

Page 5: ...the unit and if there is a difference the label on the unit is the correct one For the State of Massachusetts installation and repair must be done by a plumber or gasfitter licensed in the Commonwealth of Massachusetts FortheStateofMassachusetts flexiblecon nectorsshallnotexceed36inchesinlength For the State of Massachusetts the appli ances individual manual shut off must be a t handle type valve ...

Page 6: ...tly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspecti...

Page 7: ...ation and any repairs to this appliance should be done by a qualified service person Aprofessional service person should be called to inspect this appliance annually Make it a practice to have all of your gas appliances checked annually 13 Do not slam shut or strike the glass door 14 Under no circumstances should any solid fuels wood paper cardboard coal etc be used in this appliance 15 The applia...

Page 8: ...1 Clocking the appliance to ensure the correct firing rate rate noted on label after burning appliance for 15 minutes 2 If required adjusting the primary air to ensure that the flame does not carbon First allow the unit to burn for 15 20 min to stabilize Diagram 1 CAUTION Any alteration to the product that causes sooting or carboning that results in damage is not the responsibility of the manufact...

Page 9: ...lation 34 9 16 16 407mm 23 584mm 878mm 26 1 16 662mm 406mm 16 NAILING STRIP 2 1 2 64mm 742mm 29 1 4 21 3 8 543mm 26 660mm 29 7 16 747mm 742mm 29 1 4 3 76mm Unit Dimensions 4 sided faceplate Dimensions 36 3 4 42 5 16 6 3 8 2 51mm 162mm 1074mm 933mm ...

Page 10: ...less otherwise stated A major cause of chimney related fires is failure to maintain required clearances air space to combustible materials It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions C F G Clearance Dimension Measured From A Front Floor Clearance min 0 Underside of Unit B Sidewall on one side 9 229mm Side Opening of U...

Page 11: ...th a non combustible board This drawing is to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mantel and the facing is heat resistant or the paint may discolour Combustible mantel leg clearances as per diagrams below Drywall Mantel Clearances 2 0 12 6 4 8 10 2 0 12 6 4 8 10 Top opening of Unit ...

Page 12: ...E 10 Direct Vent Gas Fireplace 12 installation Mantel Leg Clearances Combustible mantel leg clearances from side of unit as per diagram Top View 0 3 Allowable mantel leg projection 6 3 4 9 Side opening of Unit ...

Page 13: ...or other Non Combustible finish G Framing Width 35 889mm 35 889mm H Framing Height 31 3 4 806mm 31 3 4 806mm I Framing Rise from Floor 0 when not using a surround mantel 0 2 min w Modera Mantel 3 5 16 min w Verona Surround J Framing Depth Vertical Horizontal 23 1 4 578mm Vertical Rise 20 1 4 502mm Rigid 16 1 2 406mm Flex 22 3 4 578mm Vertical Rise 19 3 4 502mm Rigid 16 406mm Flex K Corner Wall Len...

Page 14: ... extend onto the metal surface of the unit 5 Tile Finish Option 2 If applying a non combustible finishing material tile slate brick stone mantel surround etc the material can be installed directly onto the metal surface of the unit in the area shown below 29 7 16 747mm 21 3 8 542mm Tile STONE Brick Mantel Surround Finish 1 There are 8 eight side nailing strips and one top nailing strip available o...

Page 15: ...aterialshouldbuttupcleanly to the flanges around the firebox opening Rough edges may be visible from an angle To maintain a clean finished edge facing material edges may be finished with a J style trim or metal cornerbead both materials available at your local building or hardware store IMPORTANT Materials used must be NON COMBUSTIBLE 6 If applying a non combustible facing it may be installed over...

Page 16: ... Vent Pro Selkirk Direct Temp Amerivent Direct Vent Metal Fab Sure Seal Security Secure Vent and ICC Excel Direct for Horizontal and Vertical Terminations see following Venting Sections for more details Note These flue pipes must not be connected to any other appliance The gas appliance and vent system must be vented directly to the outside of the building and never be attached to a chimney servin...

Page 17: ...ded above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm L Clearance to a mechanical air supply inlet 3 91cm above if within 10 3m horizontally 72 1 8m 36 90cm b M Clearance above paved sidewalk or a paved driveway located on public p...

Page 18: ...x Termination Kit Part 946 513 includes all the parts needed to install the P33CE with a maximum run of 2 feet If install ing the P33E with a continuous vent length of more than 2 ft 6m to a maximum of 10 ft 3 0m use Kit 946 515 4 ft or 946 516 10 ft or see Rigid Pipe Venting Systems Section for alternate venting arrangements 1 6 7 8 dia flexible liner 2 ft length 2 4 dia flexible liner 2 ft lengt...

Page 19: ...he vent assembly by applying Mill Pac to the 4 100mm inner collar of the termination and slipping the 4 100mm liner over it at least 1 3 8 35mm Fasten with the 3 screws drillingpilotholeswillmakethiseasier Apply Mill Pac or high temperature silicone to the 6 7 8 175mm flex pipe and slip it over the 6 7 8 outer collar of the vent terminal at least 1 3 8 35mm and fasten with the 3 screws 4 Separate ...

Page 20: ...tallation Max Wall Vent Length Thickness inches Required inches 7 1 4 6 10 1 4 9 13 1 4 12 12 1 4 15 7 8 11 14 5 8 Adj Pipe 18 1 4 25 1 4 11 14 5 8 Adj Pipe Alternate Horizontal Termination Caps This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction withDuraventDirect Vent SelkirkDirect Temp Ameri Vent Direct venting and Security Secure Vent systems Use of these ...

Page 21: ...0 Black N A N A N A 4DALB N A TC 4DLTB Adjustable Length 7 Galvanized N A N A 4D7A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A Extension Pipe 8 1 2 Black 46DVA 08AB N A N A N A N A N A Adjustable Length 12 Galvanized N A N A 4D12A N A SV4LA12 N A Adjustable Length 12 Black N A N A 4D12A N A SV4LBA12 N A Extension Pip...

Page 22: ...Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK N A Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB SV HK N A Vertical Termination Kit Disc 4DT VKC 4DHTK 4DHTK SV FK N A FPI 946 506 P Vent Guard Optional for AstroCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adaptor Must use with all rigid piping 946 208 P Vent Guard Optional for Ris...

Page 23: ... using Contemporary Faceplate unit must be raised 1 Note Must use optional rigid pipe adapter when using rigid vent systems Part 510 994 Rigid Pipe Venting Arrangements Vertical Terminations Propane Natural Gas The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations using one 90o elbow with rigid pipe vent systems for Propane and Nat...

Page 24: ...thediagramshowsallallowablecombinationsofstraight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45o elbows allowed Vent must be supported at offsets Firestops are required at each floor level and whenever passing through a wall Maintain clearances to combustibles When using Contemporary Faceplate unit must be raised 1 ...

Page 25: ...r Part 510 994 when using rigid pipe vent systems Refer Rigid Pipe Venting Systems Section Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall When using Contemporary Faceplate unit must be raised 1 A vent guard should be used whenever the terminationislowerthanthespecifiedminimum or as pe...

Page 26: ...e 90o elbow Two 45o elbows Option H V H H1 H2 With these options maximum total pipe length is 30 feet with minimum of 11 feet total vertical and maximum 9 feet total horizontal P l e a s e n o t e minimum 1 foot between90o elbows is required A 1 Max 1 Min 3 Max B 2 Max 3 Min 5 Max C 3 Max 5 Min 6 Max D 4 Max 7 Min 7 Max E 5 Max 9 Min 8 Max F 6 Max 11 Min 9 Max One 90o elbow Two 45o elbows Option H...

Page 27: ...n 2 Max 4 Min 5 Max C 4 Min 3 Max 6 Min 6 Max D 5 Min 4 Max 8 Min 7 Max E 6 Min 5 Max 10 Min 8 Max F 7 Min 6 Max 12 Min 9 Max One 90o elbow Two 45o elbows Option V H V V1 With these options maximum total pipe length is 30 feet with minimum of 6 feet total vertical and maximum 8 feet total horizontal Please note minimum 1 foot between 90o elbows is required A 1 Min 4 Max 2 Min B 2 Min 5 Max 3 Min C...

Page 28: ...lbows One 90o elbow Two 45o elbows With these options max total pipe length is 30 feet with min of 11 feet total vertical and max 7 feet total horizontal Please note min 1 foot between 90o elbows is required Option V H H1 V V1 A 2 Min 3 Max 4 Min B 3 Min 4 Max 6 Min C 4 Min 5 Max 7 Min D 5 Min 6 Max 8 Min E 6 Min 7 Max 9 Min F 7 Min 8 Max 10 Min Withtheseoptions max total pipelengthis30feetwithmin...

Page 29: ...nations Section for minimum and maximum heights Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit whichcontainsthefollowing Co linear Flex Adapter Outer Pipe Inner Pipe Adapter 510 994 Rigid Pipe Adaptor 46DVA E45 45o Elbow Alternate Approved Caps 46dva VC Vertical Termination Cap 46dva VCH High Wind Cap 46d...

Page 30: ...o linear Flex System for both Residential Manufactured Homes into Masonry Fireplaces The shaded area in the diagrams show the allowable vertical terminations 8 2 4m Min 30 762mm 30 9 1m Max 30 Horizontal Distance Feet Vertical Height feet 2 51mm max When using Contemporary Faceplate unit must be raised 1 ...

Page 31: ...r types of sidings Diagram 2a Install the vent system according to the manufacturer s instructions included with the components 1 Set the unit in its desired location Check to determine if wall studs or roof rafters are in the way when the venting system is attached If this is the case you may want to adjust the location of the unit Rough in the gas preferably on the right side of the unit and the...

Page 32: ...ce with each approved venting system it is highlyrecommendedtoapply Mill Pac sealant supplied toeveryinnerpipeconnection Failure to do so may result in drafting or performance issues not covered under warranty Silicone red RTV is optional 8 Slide the appliance and vent assembly towards the wall carefully inserting the vent pipe into the vent cap assembly It is important that the vent pipeextendsin...

Page 33: ...e hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do not over tighten High Elevation This unit is approved in Canada for altitude to 4500ft CAN CGA 2 17 M91 ForNaturalGas installations above 4500 ft follow current CAN CGA B149 1 Pilot Adjustment Note Ifyouhaveanincorrectflamepattern contact your Regency dealer for further instructions Incorrect flame ...

Page 34: ... Burner Assembly to the left and lift out 3 Remove logs and brick panels if installed 4 Remove the 2 screws holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out 6 Unscrew the pilot orifice with the Allen key and replace with the LPG pilot orifice in the kit and replace pilot cap 7 Remove burner orifice with a 1 2 wrench and discard Use another wrench to...

Page 35: ...uctionsbelowcarefully and refer to the diagrams If logs are broken do not use the unit until they are replaced Broken logs can interfere with the pilot operation Log Kit 431 930 contains the following pieces A 250 Rear Log B 254 Middle Cross Log C 253 Front Left Cross Log D 251 Rear Left Log E 252 Front Right Cross Log F Embers 902 156 G Vermiculite 902 179 H Rock Wool 902 153 I Platinum Embers 94...

Page 36: ...wool and gently place them on the front of the burner tray in the places shown in the photo below Do not compress the rock wool leave it loose Separate platinum embers and place them on the front of the burner on and around the rock wool Place rock wool in these 2 locations on the burner tray 251 2 5 2 250 254 2 5 3 250 254 2 5 3 251 2 5 3 250 254 2 5 3 254 252 Cutout 9 Test fire to ensure proper ...

Page 37: ...y on the unit See Diagram 3 Use the hook to pull the spring out until you can put the hook into the slot on the bottom door bracket Repeat for 2nd spring See Diagram 4 To remove the flush door reverse the above steps Diagram 3 Diagram 2 Diagram 1 Diagram 4 mesh barrier 1 To remove the mesh barrier grasp mesh barrier on both sides from the bot tom Lift up and out slightly to release from bottom mag...

Page 38: ... combustible Material 3 1 2 x 36 Nailing Strip 1 2 back from unit face Combustible Material 2 Install four 4 wood screws two 2 on each side of the bracket into the wall studs as shown below Diagram 1 Materials flush w unit Diagram 2 Bracket screw locations on unit Diagram 3 Bracket screw locations Diagram 4 Line up faceplate and bracket Middle Rib on Faceplate Diagram 6 Final Install Diagram 5 Han...

Page 39: ...quire a 120V A C supply for operation but it is highly recommended to install the supplied AC adaptor to eliminate the need for batteries In case of a power failure the burner switch and the optional remote control will continue to operate if batteries are installed in the receiver However a 120V A C power supply is needed for the fan blower operation Do not cut the ground terminal off under any c...

Page 40: ...n on the fan base Ensure the fan blades do not rub against the valve tubing 4 Connect the power cord and fan ground wires to the ground lug Refer to wiring diagram 5 Slide the thermodisc cover assembly on to the bracket clip on the underside of the firebox Thermodisc Clip 6 Install the Fan Control Module FCM on the base of the unit to the left of the gas valve Plug the FCM into the outlet 7 Plug i...

Page 41: ...t ed on the floor of the unit Take care not to damage the insulation on the fan base Ensure the fan blades do not rub against the valve tubing 9 Connect fan ground wire to to the ground lug Refer to wiring diagram 10 Slide the thermodisc cover assembly on to the bracket clip on the underside of the firebox 11 Plug in the fan power cord to the Fan Control Module into the outlet marked Fan Plug the ...

Page 42: ...installation TO REMOVE THE FAN 1 Shut the power off 2 Reverse the above instructions Note The bearings are lubricated for life Do not lubricate them Make sure you vacuum the fan area on a regular basis IMPORTANT These fans collect a lot of dust from within your home Ensure you maintain these fan motors on a regular basis by vacuuming out the fan blades and housing using a soft brush nozzle Diagram...

Page 43: ...wiring diagram with optional fan SureFire Switch Caution Labelallwirespriortodisconnection whenservicingcontrols Wiringerrorscancause improper and dangerous operation Caution Ensure that the wires do not touch any hot surfaces and are away from sharp edges ...

Page 44: ...t of the paint curing process To ensure that the paint is properly cured it is recommended that you burn your fireplace for at least four 4 hours the first time you use it with the fan on Whenfirstoperated theunitwillreleaseanodour caused by the curing of the paint the burning off of any oils remaining from manufacturing Smoke detectors in the house may go off at this time Open a few windows to ve...

Page 45: ...here is no flame ignition rectification the board will stop sparking for approximately 35 seconds After wait time the board will start second try for ignition by sparking for approximately 60 seconds If there is still no positive ignition the board will go into lock out The system will need to be reset as follows a Turn the system off using ON OFF switch or press ON OFF button if using optional re...

Page 46: ...s supplier AVERTISSEMENT Quiconque ne respecte pas à la lettre les instructions dans la présente notice risquede déclencher un incendie ou une explosion entraînant des dommages des blessures ou la mort Une installation d ajustement de modification de service ou d entretien peut provoquer des blessures ou des dommages matériels Reportez vous au manuel du propriétaire de l information fournie avec c...

Page 47: ...dexteriorportionsofthesystem being exposed to cold weather 4 Inspect joints to verify that no pipe sections or fittings have been disturbed and consequently loosened Also check mechanical supports such as Wall Straps or plumbers tape for rigidity Log Replacement Theunitshouldneverbeusedwithbrokenlogs Turn off the gas valve and allow the unit to cool before opening door and carefully remove the log...

Page 48: ... dealers Do not use abrasive materials Do not clean the glass when hot In the event that you break your glass by impact purchase your replacement from an authorized Regency dealer only and follow our step by step instructions for replacement Flush Glass Replacement Remove the flush door front Remove the 4 glass clips from each corner Slide in the new replacement glass Push the 4 glass clips back o...

Page 49: ...ft out the burner grate assembly 4 Remove the rear log stand by removing the 2 screws Installing Valve 1 Install new valve assembly 2 Reverse steps 7 1 Diagram 5 Lift out Valve Tray Assembly EV1 EV2 Ground 8 Remove valve tray assembly 7 Remove the 12 screws securing the valve tray assembly in place Diagram 4 and then lift the entire assembly out Diagram 4 Valve Tray Assembly Diagram 2 Diagram 3 Re...

Page 50: ...sembly 940 380 P Replacement Glass w Gasket 911 012 Digital Fireplace Control 911 037 Flame Sense 911 038 Flame Electrode 910 432 Pilot Tube w nuts 911 039 Pilot Hood 910 100 Pilot Orifice NG 910 101 Pilot Orifice LP 911 013 Valve Wiring Harness 911 032 Remote Wiring Harness Part Description 910 572 Remote Receiver 910 592 Remote Handheld Transmitter 911 127 Receiver Compartment Door 911 137 Pilot...

Page 51: ... 59 Firebox Base 60 Valve Tray 66 911 006 Pilot Assy 885 S I T NG 911 007 Pilot Assy 885 S I T LP 904 568 Orifice 44 Natural Gas 904 575 Orifice 55 Propane 936 170 Orifice Gasket 67 Pilot Holder 68 W840470 Pilot Assembly Gasket 79 433 525 Burner Assy NG LP 82 433 024 Burner Grate Assembly NG LP 83 Rear Log Support Bracket NG LP 85 431 930 Log Set 86 430 097 Air Deflector Left 87 433 018 Air Deflec...

Page 52: ...52 P33CE 10 Direct Vent Gas Fireplace 52 notes ...

Page 53: ...P33CE 10 Direct Vent Gas Fireplace 53 53 notes ...

Page 54: ...54 P33CE 10 Direct Vent Gas Fireplace 54 notes ...

Page 55: ...ansportation Prepaid if requested Porcelain Enamel Absolute perfectionisneither guaranteednor commercially possible Any chips must be reported and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced co...

Page 56: ...___________________________________________________ Phone ____________________________________________________________ Date Installed _______________________________________________________ Serial No _ __________________________________________________________ Register your Regency warranty online www regency fire com Reasons to register your product online today View and modify a list of all your...

Reviews: