background image

Regency

®

 P36D-1 Zero Clearance Direct Vent Gas Fireplace

49

49

INSTALLATION

OPERATING INSTRUCTIONS

IMPORTANT Gas on/off knob cannot be 
turned from "PILOT" to "OFF" unless it is 
partially depressed.

1)

  Turn burner OFF using "ON/OFF" switch.

2)

  Turn gas control knob so indicator points 

to "OFF" position and allow 5 minutes for 
any gas in the combustion chamber to 
escape.

3)

  Turn gas control knob counterclockwise 

so indicator points to the "PILOT" position. 
Depress the gas control knob fully. Depress 
the igniter button several times until the 
pilot lights. After approximately one minute, 
release the gas control knob. The pilot fl ame 
should continue to burn. If the pilot does not 
remain lit, repeat operation allowing a longer 
period before releasing gas control knob.

4)

  When the pilot stays lit, turn the gas knob 

further counterclockwise to the "ON" 
position.

5)

  Use the wall switch, thermostat or remote 

control to turn on the unit.

6)

 Rotate 

the 

fl ame height regulator to adjust 

the fl ame height higher or lower.

SHUTDOWN 

PROCEDURE

    

1)

  Use the wall switch, thermostat or remote 

control to turn off the main burner.

2)

  Turn the main gas control clockwise to the 

"OFF" position to turn off the pilot.

3)

  Turn off all electric power to appliance if 

service is to be performed. 

FIRST FIRE

The fi rst fi re in your fi replace is part of the paint 
curing process. To ensure that the paint is 
properly cured, it is recommended that you burn 
your fi replace for at least four (4) hours the fi rst 
time before you use it with the fan on. 

When fi rst operated, the unit will release an odour 
caused by the curing of the paint, the burning 
off of any oils remaining from manufacturing. 
Smoke detectors in the house may go off at 
this time. Open a few windows to ventilate the 
room for a couple of hours. 

The glass panel may require cleaning after the 

unit has cooled down. 

 

DO NOT ATTEMPT 

TO CLEAN THE GLASS WHILE IT 
IS HOT. 

Note:  When the glass is cold and the 

appliance is lit, it may cause 
condensation and fog the glass. 
This condensation is normal and will 
disappear in a few minutes as the 
glass heats up.

DO NOT BURN THE APPLIANCE 
WITHOUT THE GLASS FRONT IN 
PLACE.

During the fi rst  few  fi res, a white fi lm 
may develop on the glass front as part 
of the curing process. The glass should 
be cleaned or the fi lm will bake on and 
become very diffi cult to remove. Use a 
non-abrasive cleaner and NEVER clean 
the glass while it is hot.

AERATION 

ADJUSTMENT

    

The air shutter can be adjusted by moving the 
adjusting wire up or down. The wire is accessed 
through the bottom louver opening. Open the air 
shutter for a blue fl ame or close for a yellower 
fl ame. The burner aeration is factory set but 
may need adjusting due to either the local gas 
supply or altitude. 

Minimum Air Shutter Opening:
 3/16" 

Natural 

Gas

 1/4" 

Propane

CAUTION: Carbon will be produced if air shutter 
is closed too much. 

Note:   Any damage due to carboning 

resulting from improperly setting 
the aeration controls is NOT covered 
under warranty.

Note:  Aeration Adjustment should only 

be performed by an authorized FPI 
Installer at the time of installation or 
service.

Adjustment Wire: Push to close or pull to 

open aeration cap.

Closed - Tall yellow

Open - Short Blue

NORMAL OPERATING 

SOUNDS OF GAS 

APPLIANCES

It is possible that you will hear some sounds 
from your gas appliance. This is perfectly normal 
due to the fact that there are various gauges 
and types of steel used within your appliance. 
Listed below are some examples. All are 

normal 

operating sounds 

and should not be considered 

as defects in your appliance.

IMPORTANT

To ignite or reignite the pilot, you 

must fi rst release the tension springs 

below the door. 

Only when the pilot holds, without pressure 
being applied to the control knob, reapply the 
tension springs to the door. The unit 

must 

not

 be operated with the tension springs 

unattached. 

NOTE: For all propane units and units    

equipped with electric spark boxes, 
see "Copy of Lighting Plate Instruc-
tions" section for more details.

LIGHTING 

PROCEDURE

OPERATING 

INSTRUCTIONS

1)

  Read and understand these instructions 

before operating this appliance.

2)

  Check to see that all wiring is correct and 

enclosed to prevent possible shock.

3)

  Check to ensure there are no gas leaks.

4)

  Make sure the glass in the door frame is 

properly positioned. Never operate the 
appliance with the glass removed.

5)

  Verify that the venting and cap are 

unobstructed.

6)

  Ensure that the brick panels are installed.

7)

  Verify log placement. If the pilot cannot be 

seen when lighting the unit, the logs have 
been incorrectly positioned.

8)

  The unit should never be turned off, and on 

again without a minimum of a 60 second 
wait.

Summary of Contents for P36D-LP1

Page 1: ...tly a fire or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or...

Page 2: ...esigned to provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model P36D 1 has been approved by Warnock Hersey for both safety and efficiency As it also bears o...

Page 3: ...must comply with the manufacturer s installation instructions and local codes if any In the absence of local codes follow the current National Fuel Gas Code ANSI Z223 1 and the current National Elect...

Page 4: ...Wiring Diagrams 46 Optional Fan Installation 48 Optional Fan Removal 48 SAFETY LABEL Copy of Safety Decal for P36D 1 6 REQUIREMENTS MA Code CO Detector 7 INSTALLATION Unit Dimensions 8 Before You Sta...

Page 5: ...Copy of the Lighting Plate Instructions 50 MAINTENANCE Maintenance Instructions 50 General Vent Maintenance 51 Log Replacement 51 Thermopile Thermocouple 51 Glass Gasket 51 Door Glass 51 Flush Glass R...

Page 6: ...l Bay Window Part 510 930 Option HeatWave Kit 946 556 Cet appareil doit tre utilize uniquement avec le type de gaz indiqu sur la plaque signal tique Cet appareil peut tre install dans une maison pr fa...

Page 7: ...ade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS V...

Page 8: ...8 Regency P36D 1 Zero Clearance Direct Vent Gas Fireplace INSTALLATION 36 914mm 33 838mm 36 914mm 30 1 2 775mm 37 940mm 17 1 8 435mm 32 1 2 826mm 37 940mm UNIT DIMENSIONS...

Page 9: ...APPLIANCE BE KEPT CLEAN DUE TO HIGH TEMPERATURES THE APPLIANCE SHOULD BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITURE AND DRAPERIES WARNING FAILURE TO INSTALL THIS APPLIANCE CORRECTLY WILL VOID YOUR...

Page 10: ...and ceilings when cutting holes for termination 11 Under no circumstances should this appliance be modified Parts that have to be removed for servicing should be replaced prior to operating this appl...

Page 11: ...stallationswhenusedwithaListedMillivolt Thermostat Some areas may have further requirements check local codes before installation 6 The P36D 1 Direct Vent Gas Fireplace is approvedforalcoveinstallatio...

Page 12: ...talled only in accordance with these instructions Clearance to Combustibles from Back 0 0mm Side 0 0mm Floor 0 0mm NOTE The minimum floor clearance must be maintained from the top surface of the carpe...

Page 13: ...Regency P36D 1 Zero Clearance Direct Vent Gas Fireplace 13 INSTALLATION Clearances for Flush Front Full Screen Doors REGENCY CLEARANCES TRIPOLI ARCH DOOR CLEARANCES Note No Hearth Required...

Page 14: ...clearances are critical Combustible mantel clearances from top of unit are shown in Diagram 1 Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs cov...

Page 15: ...from top of unit are shown in the diagram below Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non combustible board These drawi...

Page 16: ...16 Regency P36D 1 Zero Clearance Direct Vent Gas Fireplace INSTALLATION REGENCY MANTEL LEG CLEARANCES Combustible mantel leg clearances as per diagram Maximum 1 1 2 projection at 2 minimum clearance...

Page 17: ...to the ceiling 2 Frame in the enclosure for the unit with framing material The framed opening is 37 1 4 high x 36 1 4 wide x 17 3 8 deep 946mmhighx921mmwidex441mmdeep FRAMING AND FINISHING Note 40 1 2...

Page 18: ...lete framing dimensions see instructions in this manual The Tripoli Arch Door also requires steel stud framing above and on each side of the unit see diagram 2 TRIPOLI ARCH DOOR FRAMING NOTE Steel Stu...

Page 19: ...ecombustionchambertherebyeliminatingthe need to use heated room air for combustion and losing warm room air up the chimney Note These flue pipes must not be connected to any other appliance The gas ap...

Page 20: ...ne extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any...

Page 21: ...ap termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1 1 2 Drill Point Stainless Steel 4 1 6 7 8 dia flexible liner 10 ft length 2 4 dia flexible liner 10 ft length 3 s...

Page 22: ...N A N A N A Adjustable Length 3 10 Galvanized N A N A N A 4DAL N A TC 4DLT Adjustable Length 3 10 Black N A N A N A 4DALB N A TC 4DLTB Adjustable Length 7 Galvanized N A N A 4D7A N A N A N A Adjustabl...

Page 23: ...izontal Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK N A Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB SV HK N A Vertical Termination Kit Disc 4DT VKC 4DHTK 4D...

Page 24: ...es The FPI AstroCapTM and FPI Riser Vent terminal are certified for installations using FPI venting systems as well as Simpson Dura Vent Direct Vent American Metal Products Security Secure Vent AmeriV...

Page 25: ...6 7 8 inner diameter Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall NOTE If you are i...

Page 26: ...n clearances to combustibles Note Must use optional rigid pipe adaptor when using rigid vent systems Part 510 994 VENTING ARRANGEMENTS VERTICAL TERMINATION RIGID PIPE SYSTEM Propane Natural Gas The sh...

Page 27: ...he diagram 1 The shaded area in the diagram 1 shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum...

Page 28: ...al Please note minimum 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H V V1 H H1 A 0 Min 1 Max 1 Min 2 Max B 1 Min 2 Max 3 Min 3 Ma...

Page 29: ...ertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H H1 V V1 A 0 Min 2 Max 2 Min...

Page 30: ...bending The Air Intake pipe must be attached to the inlet air collar of the termination cap Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 C...

Page 31: ...NTING ARRANGEMENT VERTICAL TERMINATIONS CO LINEAR FLEX SYSTEM INTO MASONRY FIREPLACES FOR BOTH RESIDENTIAL MANUFACTURED HOMES The shaded area in the diagrams show the allowable vertical terminations 8...

Page 32: ...nt is only for use in above grade terminations NOTE For best results and optimum performance with each approved venting system it is highly recommended to apply Mill Pac sealant supplied to every in n...

Page 33: ...xit and mark the location wheretheventwillpenetratetheceiling Drill a small hole at his point Next drop a plumb bob from the roof to the hole previously drilledintheceiling andmarkthespotwhere the ven...

Page 34: ...ECT VENT SYSTEM FLEX INSTALLATION PROCEDURES 1 Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the lef...

Page 35: ...ll probably yellow flames not coming into proper contact with the rear burner or thermopile or thermocouple alwaysbesttoconsultwithyourlocalauthorities and the CAN CGA B149 installation code For USA i...

Page 36: ...s holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out DC Sparker Kit Contains Qty Part Description 1 820 475 Bracket DC Sparker 1 820 476 Bracket DC Spark...

Page 37: ...or and connect it to the DC Sparker Piezo Ignitor Ignitor Wire Piezo Ignitor Ignitor Wire DC Sparker 18 Reverse steps 6 1 Fig 1 11 Remove the black protection cap by hand from the hi low knob Fig 1 Fi...

Page 38: ...et and outlet pressures 37 Check operation of flame control 38 Check for proper flame appearance and glow on logs NOTE The battery in the DC Sparker Box will need to be replaced an nually 25 Locate th...

Page 39: ...by carefully slipping it between the back wall of the firebox and the rear log bracket 3 Put the side panels in next Slide them in from the front and push them flat up against the wall Be very careful...

Page 40: ...log kit Part 780 930 contains the following pieces a 02 75 Rear Log b 02 55 Middle Left Log c 02 50 Front Left Log d 02 53 Center Left Log e 02 51 Front Bottom Log f 02 54 Center Right Log g 02 52 Mid...

Page 41: ...rest the log on the cutout on Log 02 53 Cutouts 5th Grate Tab 02 54 0 2 5 3 02 51 6 Position Log 02 54 across the cutouts in Logs 02 51 and 02 53 The notch in the bottom right end fitting against the...

Page 42: ...52 02 51 02 54 02 52 02 54 8 Place Log 02 52 between Logs 02 51 and 02 75 and on the indentation on Log 02 54 The bottom right end sits behind the rear grate tab Front Brackets Notch 02 50 02 53 02 50...

Page 43: ...nd around the embers Avoid stacking platinum embers Platinum embers may be placed over burner ports 11 Test fire to ensure proper light off make sure flame flows smoothly from one end of burner to the...

Page 44: ...2 The standard flush door comes with a black frame To install the frame simply hook the top door flange onto the top of the unit and swing the door towards the unit see diagram 1 Be careful that the...

Page 45: ...warranty The remote control kit comes with a hand held transmitter areceiverandawallmountingplate 1 Choose a convenient location on the wall to install the receiver and the receptacle box protection f...

Page 46: ...ill continue to operate However a 120V A C power supply is needed for the fan blower operation Do not cut the ground terminal off under any circumstances NOTE Even if the fan is not purchased with the...

Page 47: ...6D 1 Zero Clearance Direct Vent Gas Fireplace 47 INSTALLATION For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in t...

Page 48: ...pproximately4 fromthecontrolbox Ensure that there is no interference with the wires when the louver is closed and that no wire will touch the hot metal surfaces or sharp edges 13 Plug the fan power co...

Page 49: ...s part of the curing process The glass should be cleaned or the film will bake on and become very difficult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot AERATION ADJU...

Page 50: ...y is positioned directly under the burnertube s andlogsandismadeofadifferent gauge material from the rest of the firebox and body Therefore thevaryingthicknessesofsteel will expand and contract at sli...

Page 51: ...shown in the diagrams under Log Installation Note Improper positioning of logs may create carbon build up and will severely alter the unit s performance which is not covered under warranty THERMOPILE...

Page 52: ...asket may severely affect the appliance performance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate connections on the valve 11 Reinstall the bottom brick pan...

Page 53: ...at is attached 2 screws per hinge to the lip on bottom of the unit 3 Open the bottom louver Pull the Burner ON OFF control box from inside the bottom of the fireplace and position the slots in the bra...

Page 54: ...the inner cut outs to secure the base of the Frame using the 2 x Hex Head Drill Point Screws provided Backside of Full Screen Door Frame Shown Inside Top of Outer Frame Hinge Bracket Inner Hinge Brack...

Page 55: ...inge Location 6 Slide the Top Grill into the louver brackets located on the inside top of the firebox Push in place Top Grill 8 Close screen doors 7 Install the Left and Right Side Screen Doors in the...

Page 56: ...agram 1 Min 14 1 4 362mm P36 Min 361 4 921mm Steel Stud Steel Stud Min 18 5 8 473mm P36D Option 1 Fireplace with 1 2 13mm Facing Material INSTALLATION NOTE The hearth material must be brought past the...

Page 57: ...bracket as indicated refer to Diagram 2 3 Install On Off switch refer to Diagram 3 4 Place bracket under the Flange Secure with 2 screws as indicated in Diagram 4 Diagram 2 Diagram 3 5 Loosen the 3 x...

Page 58: ...th the correspond hole on the Top Support Frame then secure with 1 screw b Repeat step on the other side 10 Change in Logo Replace existing logo with Regency logo a Mount Side Support Frame to unit as...

Page 59: ...ght 34 Brick Panel Bottom 35 Thermodisc Bracket 432 967 Burner ON OFF Switch Assy 38 910 241 Switch Burner ON OFF 3 way 910 899 Wire Harness Valve to Burner 432 917 Fan Speed Control Assy 120 Volts Op...

Page 60: ...pane 56 Valve Tray NG LP 57 910 478 Valve S I T Natural Gas Propane 58 Valve Bracket 65 Pilot Bracket 66 910 038 Pilot Assy S I T 3 Flame NG 910 039 Pilot Assy S I T 3 Flame LP 67 Pilot Holder 68 W840...

Page 61: ...ole 904 691 U Clip 510 920 Flush Louvers Set Gold Blk 510 921 Flush Louvers Set Brass Blk 510 922 Flush Louvers Set Black 510 923 Flush Louvers Set Steel Black 138 Flush Louver Assy Top 139 Flush Louv...

Page 62: ...62 Regency P36D 1 Zero Clearance Direct Vent Gas Fireplace NOTES...

Page 63: ...agent Transportation Prepaid if requested Porcelain Enamel Absolute perfectionisneither guaranteednor commercially possible Any chips must be reported and inspected by an authorized dealer within thr...

Page 64: ...register your product online today View and modify a list of all your registered products Request automatic email notification of new product updates Stay informed about the current promotions events...

Reviews: