10
Regency Horizon HZ54E-1 Gas Fireplace
INSTALLATION
Caution Requirements
The top, back and sides of the fi replace are defi ned by
standoffs. The metal ends of the standoff may
NOT
be
recessed into combustible construction.
WARNING
Fire hazard is an extreme risk if these clearances (air space) to combustible materials
are not adhered to. It is of greatest importance that this fi replace and vent system be
installed only in accordance with these instructions.
CLEARANCES
The clearances listed below are Minimum distances unless otherwise stated:
A major cause of chimney related fi res is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance
that this fi replace and vent system be installed only in accordance with these instructions.
F
B
E
D
A
Installed Close
to Floor
G
Clearance:
Dimension
Measured From:
A: Mantel Height (min.)
20" (508mm)
Top of Fireplace Opening
B: Sidewall (on one side)
4" (102mm)
Side of Fireplace Opening
C: Ceiling
(room and/or alcove)
40-7/8" (1038mm)
Top of Fireplace Opening
D: Mantel Depth (max.)
13" (330mm)
30" Above Fireplace Opening
E: Alcove Width
83" (2108mm)
Sidewall to Sidewall (Minimum)
F: Alcove Depth
36" (914mm)
Front to Back Wall (Maximum)
G: To Floor
28 - 7/8" (733mm)
Top of Fireplace Opening
Note
0"
No hearth required
F
B
C
Installed Close
to Ceiling
Flue Clearances to Combustibles
Horizontal - Top
3"
Horiztonal - Side
2"
Horiztonal - Bottom
2"
Vertical
2"
Passing through wall/
f l o o r / c e i l i n g - w h e n
fi restop is used.
1-1/2"
42-3/8”
(1079m
m)
3-7/8"
( 99mm)
5-1/2”
(140mm)
22-1/2”
(572
mm)
19-7/8"
(505mm)
22-5/8
”
52-7/8”
60-1/2" (1537mm)
Non-combustible
Material
Non-combustible Material
Non-combustible
Material
Non-com
bustible
Material
Metal Stud (header)
Wood Stud
Wood Stud
NON-COMBUSTIBLE REQUIREMENTS
The
HeatWave
Duct Kit and the Heat
Release Kit have different clearance
and framing requirements, check the
HeatWave
and Heat Release manual
for details.
Heat Release Kit