City Series CC40E-12
|
47
installation
Building Additional Framing Off of the Framing Kit
919-773a
04.24.17
Holes for fi xing additional
framing to kit
Potential Wood Framing installs
This framing kit is designed as a base in which to build additional
framing. Studs can be affi xed to all outer faces using the holes
identifi ed below. This will provide a stable surface that is fl ush with
the front of the fi replace, ready for drywall or other fi nishing material.
The framing must be strong enough to support the weight of all
fi nishing material and must not put any weight on the fi replace.
BUILDING FRAMING OFF OF THE KIT
1/2” for drywall
Leave gap between
framing and unit trim
for finishing material
4
CITY SERIES
Summary of Contents for City Series CC40LE-LP12
Page 104: ...104 City Series CC40E 12 warranty ...
Page 105: ...City Series CC40E 12 105 notes ...
Page 106: ...106 City Series CC40E 12 notes ...
Page 107: ......