Regada MP 52 200 Installation, Service And Maintenance Instructions Download Page 2

TEST CERTIFICATE 

 

COMPLETENESS CERTIFICATE

 

 
INSTALLATION CERTIFICATE 

 

  ELECTRIC PART-TURN ACTUATOR MP 52 200  

  Type number 52 200  .......................... 

Power supply ..............................V  ..........Hz 

  Serial number ..................................... 

Rated torque  ..............................................Nm 

  Production year  .................................. 

Switching-off torque  ...................................Nm 

  Wiring diagram  ................................... 

Operation time .........................................s/90° 

     

 

Operation angle ..............................................° 

     

 

Transmitter (potentiometer) .............................  

  Serial number of electric motor  ............................................................................................  

  Serial number of transmitter  .................................................................................................  

  Serial number of position controller ......................................................................................  

  Tests made in accordance with TP 74 0787 00 

  Tests made by ......................................................................................................................  

  Date .................................................... 

Signature and stamp  .......................................  

  Used valve...........................................................................................................................  

  Assembled by: Firm.............................................................................................................  

                      Name .............................................................................................................    

  Warranty period .................... months 

  Date .................................................. 

Signature and stamp ........................................  

  Location ..............................................................................................................................  

  Installed by: Firm  ................................................................................................................  

                    Name  ................................................................................................................  

  Warranty period..................... months 

  Date .................................................. 

Signature and stamp ........................................  

Summary of Contents for MP 52 200

Page 1: ...74 0767 02 Electric part turn actuators MP 52 200 INSTALLATION SERVICE AND MAINTENANCE INSTRUCTIONS...

Page 2: ...ng diagram Operation time s 90 Operation angle Transmitter potentiometer Serial number of electric motor Serial number of transmitter Serial number of position controller Tests made in accordance with...

Page 3: ...7 Specifications 8 1 8 Packaging Transport Storing and Unpacking 10 1 9 Liquidation of the Product and the Package 11 2 Installation and Dismantling of the Actuator 11 2 2 Dismantling 12 3 Adjusting...

Page 4: ...Operation Conditions and regarding its exposure rate is designated as a device with high exposure rate group A when it is an electric device of the group A see Regulation of MPSvR Ministry of Work and...

Page 5: ...y service is provided by the service department of the producer on the basis of a written claim While claiming it is advised to present the following basic data from the nameplate type and serial numb...

Page 6: ...llution AF 2 with a possibility of influences of mechanical stress medium sinusoid vibrations with frequency in range 10 up to 150 Hz with shift amplitude of 0 15 mm for f fp and acceleration amplitud...

Page 7: ...ule M3 a gearbox with a manual control mechanism The gear train is located in the case 1 The gears are placed on the output shaft 3 and they make up an independent assembly set The rim 44 with interna...

Page 8: ...o the control board place into the control box a transmission unit of the control board a position an indication unit a torque unit a transmitter block space heater local position indicator electric c...

Page 9: ...ig 5 Position unit 11 After loosen a nut of the position unit 51 is possible to rotate 53 54 56 57 The construction of position unit is designed so that transforming one of the cams it does not distur...

Page 10: ...ends 29 The flange 27 is screwed onto the actuator box 1 penetrated With a shaft and on its free end the lever is mounted Fig 8 1 7 Specifications Basic Specifications are given in the table 1 1 7 1...

Page 11: ...lue Adjustment of the capacitive transmitter the position open 20 mA the position close 0 4 mA Weight 27 up to 29 kg Lubrication grease HF 401 0 GLEITM m Gearbox oil PP 80 1 7 2 Mechanical Connection...

Page 12: ...or message LED SYS mode error message LED Adjusters communication connector 2x calibrating and adjusting button Local position indication with position indicator visible through aperture in upper cove...

Page 13: ...gle parts of the package and the product should not be thrown away after its lifetime but sorted according to the related regulations and rules about environment protection and delivered for next trea...

Page 14: ...rection open Press the lever 42 in the direction to the output shaft what switches contacts 20 MO S1 and the actuator should stop Press the button SB1 closed on the control board The output shaft shou...

Page 15: ...Y Fig 6 The used transmitter resistance is 100 W Switch the converter s power supply on Turn the adjusting trimmer ZERO Fig 6 to adjust the output current signal rate measured on the terminals 81 82 t...

Page 16: ...ust be power supplied In opposite case it is not guaranteed disconnection of remote control after switching the mode switch to the mode LOCAL Fig 10 4 Service maintenance and troubleshooting 4 1 Servi...

Page 17: ...upply the EA stops in the position where it was before the failure If needed the EA can be set only with the manual control the handwheel After restoration of power the EA is prepared for operation In...

Page 18: ...16 MP 52 200 4 4 Wiring diagrams...

Page 19: ...er 2 wire with power supply Z295 connection of 1 phase electric motor Z298 connection of torque and position switches and space heater Z299 connection of torque and position switches and space heater...

Page 20: ...18 MP 52 200 4 5 Dimensional drawings...

Page 21: ...MP 52 200 19...

Page 22: ...20 MP 52 200...

Reviews: