The circuits must be adjusted to suit local conditions.
reflex ’variomat’
Assembly
11
Assembly diagrams
Notes for the installer
reflex ’variomat 1’
in a single-boiler system
≤
350 kW, < 100 °C, make-up using potable water
You do not need to install any
additional cap valves in the
expansion line.
reflex ’fillset’ with integrated
system separator must be
installed upstream when
connecting to the potable
water system.
If reflex ’fillset’ is not installed
upstream, a filter for the make-
up unit with a mesh size of
≤
0.25 mm must be provided
on site.
Install expansion lines over
10 m in length in DN 32.
→
page 12
1)
reflex ’fillset’
’reflex’
’variomat 1’
VG basic
vessel
1)
25
P
O
WM
Potable water
t
R
≤
70 °C
Dirt-free integration
→
p. 10
≥
500
Boiler and system protection, maintaining
pressure, degassing and water make-up
Water make-up connected directly to
the potable water system
15
reflex ’variomat 1’
in a district heating domestic
station, make-up by means of district heating return
Notes for the installer
District heating water is
generally highly suitable
as make-up water. Water
treatment is not required.
The agreement of the heating
supplier is required! Note the
connection conditions.
Install expansion lines over 10 m
in length in DN 32.
→
page 12
’variomat 2’:
An optional board with 6 digital
input and 6 floating output
contacts and pressure and level
outputs by means of isolation
amplifiers is available for special
requirements, for instance in
connection with district heating.
Please contact us for more
information..
t
R
≤
70 °C, district heating return
t
R
≤
70 °C
Dirt-free integration
→
p. 10
’variomat 1’
VG basic
vessel
1)
1)
P
O
WM
Consult the heating supplier concerning the connection
of the make-up unit to the district heating return
Generator and system protection
Maintaining pressure, degassing and make-up
on site
Filter Pressure
reducer
SV
≥
500
25
15
’reflex’