![Reflex Fillcontrol Auto 2P Operating Manual Download Page 18](http://html1.mh-extra.com/html/reflex/fillcontrol-auto-2p/fillcontrol-auto-2p_operating-manual_1432722018.webp)
Installation
18 — English
Fillcontrol Auto Make-up and degassing — 06.07.2016 - Rev. B
6.1
Installation conditions
6.1.1
Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages during transport cannot be excluded.
Proceed as follows:
1. Upon receipt of the goods, check the shipment for
•
completeness and
•
possible transport damage.
2. Document any damage.
3. Contact the forwarding agent to register your complaint.
6.2
Preparatory work
Preparing the device installation:
•
Frost-free, well-ventilated room.
– Room temperature range: 0 °C to 45 °C.
•
Filling connection.
– If necessary, provide a DN 15 filling connection according to DIN 1988 T 4.
•
Electric connection: 230 V~, 50 Hz, 16 A with upstream ELCB: Tripping current 0.03 A.