
Rev 20220606
RX2505AC
Page
24
of
35
Table 5-6 - DRM pins detail
6
Operation
6.1
Checklist before operation
1. Check whether the system is firmly installed, and the installation position is suitable for operation
and maintenance.
2. All cables are correctly connected, properly distributed, and well protected, and no mechanical
damage is present.
3. The selection of AC circuit breakers is correct.
4. The wiring terminals are securely installed, and the vacant terminals are sealed.
5. All safety signs and warning labels on the system are firmly and clearly visible
.
1
2
3
4
5
6
7
8
DRM0_1
DRM0_2
N/A
N/A
N/A
N/A
N/A
N/A
Figure 5-13 - DRM cable assembly
Figure 5-14 - DRM RJ45 pins