Effective from 29-Jul-21
Page | 11
Stage 6. Door
Note: Do not fit the door track or the door itself to the building until after the door end wall cover has been fitted.
Fitting the door and door track
1.
Rest the door on top of the end base rail and slide the door track onto the two door rollers
2.
Note that the door guide and its corresponding slider is already pre-fitted to the base rail and the underside of the door.
3.
Lift up the door track with door attached into approximate position so that the weight of the door is suspended on the track, and
the base of the door is clear of the base rail. (the door guide should be still within the base rail door guide slot)
4.
Screw through the mount plate of the door track at one end to secure, then repeat this at the opposite end. see pic page 12
5.
Screw three more screws (evenly spaced) through to the door lintel to fully support the track/ Place one longer screw into the
end hoop to support that end of the door track - Check the door sliding action.
6.
Place a screw through each end of the door track where the door rollers slide to act as a stop for the door rollers so that the door
cannot slide off the track at its ends.
Note: If you have ordered the extra wide door option, there will be a 30mm x 30mm x 1.6m door track support stay included. The
stay is attached to the end wall hoop and extends up to the height of the door track to help support the end of the track with the wider
door fitted
Exterior view of door track (Pic D1)
Door guide and door guide “slot” (Pic D3)
(Pic D4) (Pic D5)
Screw into end hoop