Redexim Verti-Drain 7007 Operator / Technical And Parts Manual Download Page 7

 

 

The machine can be prepared as follows: 

1.

 

Take all separate parts from machine 

2.

 

The rear wheels with brakes can be assembled, as follows, see Fig 1A: 

-

 

The control rod mechanism 3 with the brake pedal is already installed. 

-

 

Remove the bearing 4 standard nuts one by one and put the new longer ones 5 and 6 on. 
Nut 5 is machined and should take plate 26 as well. 

-

 

Base plate 23 can be fixed with bolts 21 onto the nuts 5 and 6. Add lever 25 at the same 
time. NOTE: the lever 25 is delivered as a right and left version. When assembled, it 
should face to the rear of the machine. 

-

 

Assemble brake shoe pivot plate 17 with two bolts 15, two distance bushes 20 to the base 
plate 23. 

-

 

Fit the brake spring 19 on both brake shoes and “fold” the brake shoes around the lever 
25 flat end and the mounted pivot plate 16 

-

 

Screw the threaded studs 10 in the brake drum 8, and lock them with nut 9. NOTE. The 
threaded rod 10 may not protrude inside the brake drum.  Also use loctite so the studs are 
tight in the brake drum 8. 

-

 

Slide the distance bushes 12 on the threaded studs and mount the whole brake drum 
assembly 8 on the wheelshaft 10.  

-

 

The wheels shaft 11 assembly can be slide into the bearings 4. Don’t forget the taper bush 
28 for locking the shaft to the bearings at each side. NOTE. Take care that the splines of 
the shaft 11 match the sprocket inside. If it is hard to do, loosen the chain tension even 
further. 

-

 

The wheelshaft may not protrude the bearing 4 taper bush 28 at the Verti-Drain side. The 
shaft end should align with the taper bush 28 inside. 

-

 

Check the working of the brake by manually controlling the lever 25. The lever should 
not be tight. If it works well, mount the rod 3 end joint 27 with nut 24 to the lever 25. The 
length should be adjusted, so the brakes work even at each side of the machine. 

-

 

Check the tightness of all components. Check the working of the brakes. The pedal 
should have a free clearance of 25 mm (1”). Check / adjust the chain tension. 

3.

 

Assemble the front wheel assembly 1 with the studs/nuts 2. Take care the positioning pins 3 
line up with the main frame. Also be sure the teeth part 4 fits correctly to the gearwheel of 
steering wheel 14. 

4.

 

Assemble manual steering handle 15 with pin 17 and pin 16 to the front wheel assembly 1. Be 
careful with the electric wire. No key required !. 

5.

 

The battery needs to be filled with acid till the indicated level and charged for app. 4 hours @ 
3 Amp. The battery is located under the seat assembly 12. Remove the 4 nuts 6 and take seat  
away.  After the battery is installed, check whether gear shift rod doesn’t hit battery in 6th 
gear.(NOTE: Red wire = +,  black wire = -) 

6.

 

Fill the engine with oil (See engine manual for information).[If not done yet]. 

7.

 

Fill hydraulic tank opposite of engine with 7 ltr (2 US gallon) hydraulic oil 10W40 [If not 
done yet]. 

8.

 

Check machine for damages and loose objects/ bolts/nuts. 

9.

 

Remove the machine from pallet. Note: DON’T use lift point 11 to raise the whole machine. 
This lift point is for the Verti-Drain unit only. 

Summary of Contents for Verti-Drain 7007

Page 1: ...EST PERFORMANCE IT IS ESSENTIAL THAT THIS OPERATORS MANUAL IS CAREFULLY READ BEFORE THE VERTI DRAIN IS USED 0948 English 911 120 400 Operator Technical and Parts manual Verti Drain Model 7007 Serial n...

Page 2: ...ears this refers to safety instructions If the is used this refers to a tip and or note All information and technical specifications provided at the moment that this document is published are the most...

Page 3: ...r from the ground and unstable behavior of the VERTI DRAIN 10 Check the VERTI DRAIN once a week to ensure there are no loose screws or nuts and bolts 11 The VERTI DRAIN may never be used without prote...

Page 4: ...ation 14 13 0 Technical items 15 13 1 Rear wheel chain drive 15 13 2 Reversing safety switch at manual steering handle 15 13 3 The hydraulic system pressure 15 13 4 Transmission drive gearbox and V be...

Page 5: ...5 mm Capacity maximum 1st gear 530 sq mtr h 5600 sq ft h 2nd gear 1060 sq mtr h 11200 sq ft h 3rd gear 1590 sq mtr h 16800 sq ft h 4th gear 2120 sq mtr h 22400 sq ft h Ground pressure 0 7 bar max Ship...

Page 6: ...side of the machine The rear wheel assemblies are removed and a fake shaft 9 has been put in place to keep the sprocket wheel at its position The front wheel assembly and the manual steering handle ha...

Page 7: ...her The wheelshaft may not protrude the bearing 4 taper bush 28 at the Verti Drain side The shaft end should align with the taper bush 28 inside Check the working of the brake by manually controlling...

Page 8: ...or gear setting 8 Decall for explaining the working of the main clutch 9 Lock pin for manual steering handle 10 Clutch lever to be used in combination with walking in front only or as parking brake 11...

Page 9: ...working depth can be adjusted when the machine is lifted from the ground as follows see fig 3 Unscrew nuts 1 at each side of the machine one turn Screw spindle 3 in or out Every revolution is 4 mm 0...

Page 10: ...stomer requirements The length of the draw rod assembly should be 290 50 mm 11 437 which can be set by the calibrating shimms see the spare part page 6 0 START STOP PROCEDURES The start stop procedure...

Page 11: ...y difference adjust the working depth or change to other tines who may penetrate easier If nothing is done on the instability of the machine serious troubles may arise afterwards The machine is NOT pr...

Page 12: ...ition Check fuel level Use choke Sit on seat or squeeze dead men s handle Check switches Check wiring system Clutch is not working Check pedal stroke Friction plates are glued together And clutch will...

Page 13: ...load of drive Replace V belts Check pre tension Reduce 10 0 MAINTENANCE Pre Delivery Inspection Check oil level engine Check hydraulic oil level Fill battery and charge Assemble tines Check fuel level...

Page 14: ...f the machine but may never be less than 50 mm 2 It is also possible to secure the Verti Drain when raised Simply put lock pin 4 in the hole under the spring when fully raised see A never take lock pi...

Page 15: ...be switched from left to right and the other way round in case people want to walk at the other side see Fig 8 The handle with bolts nuts 1 can be mounted either way Check the working of the switch af...

Page 16: ...16...

Page 17: ...may damage the transmission If not tight enough the parking brake will not work which may be dangerous when the machine is used on undulated areas It is crucial that when the lever 27 is NOT activate...

Page 18: ...18...

Page 19: ...ould be removed after nut 8 has been unscrewed NOTE It is very important to check whether the Verti Drain is in balance With the Verti Drain on the ground the hydraulic cylinder should be in Only a li...

Page 20: ...20...

Page 21: ...engine is bolted to the main frame 2 Disconnect the cable tree clamp under the main clutch DO NOT disconnect the cable tree 3 Drop the gearbox to the transmission down and remove V belt 2 see also ch...

Page 22: ...22...

Page 23: ...23...

Page 24: ...h are connected with one main input drive shaft Next the 4 tine element assemblies are connected to these cranks The Verti Drain unit itself is connected to the prime mover via a three point linkages...

Page 25: ...25...

Page 26: ...r this machine see the spare part pages for a total overview Generally speaking tines can be divided into two categories Solids and Hollows We advise using genuine tines since they are fully adapted t...

Page 27: ...me length and size Replace a bent tine immediately When this is not done the machine can be unstable Don t use any thicker longer tines as what is offered by us Shorter worn tines can be used in case...

Page 28: ...nd 12 x C4 bolt The turf hold down fingers fit to the standard assembled front roller scraper The fingers can be aligned just before tightening the bolts and nuts 14 2 Rear roller The standard machine...

Page 29: ...ith lock pins 18 With the eye bolts 15 we can tilt the total unit forwards or backwards 22 which will change the pressure of the blade springs 3 to the ground The height adjustment is important Genera...

Page 30: ...30...

Reviews: