![REDEKOP Case IH AFX 120 Series Installation Manual Download Page 42](http://html1.mh-extra.com/html/redekop/case-ih-afx-120-series/case-ih-afx-120-series_installation-manual_1429047042.webp)
42
4.1.1
Lay plywood (
H1
) on top of sieve (
H
) to prevent
damaging sieve
(H)
.
4.1.2
Remove upper access panel (
F
)
** Nuts are not welded on combine at rear of panel,
use caution not to lose them **
- to be reinstalled
- keep all factory hardware
4.1.3
Remove hose clamps (
C
) securing steel hydraulic
line (
B
) running from pump (
A
) on outer combine wall to
connection (
E
) in upper access area
- qty as required
C
4.1 Hydraulic line changes at PTO
** If available - use vacuum at reservoir to reduce oil
leakage **
Parts List:
parts located in CS970S Field Install box and CS971S bag
hardware located in CS839S bag
HH112
Hydraulic Hose .625 x 148L (
I
) Qty 1
H99-12
Hose Clamp .75 (
L
)
Qty 8
H99-14
Hose Clamp .875 (
M
)
Qty 8
H99-18
Hose Clamp 1.125 (
N
)
Qty 6
H99-20
Hose Clamp 1.25 (
P
)
Qty 4
H28-1212
Fit Hyd Str 12 MORFS-12 MORFS (
B3
)
Qty
1
C
C
B
E
C
H1
F
F
I
L
N P
M
B3
C