SunRise – Installation Manual
RE_PROD_0005 Version 3
Page 20 of 28
Issue Date 16/11/2020
NORMAL OPERATION:
In this operation mode the Sunrise will operate as
explained above. Where the system uses solar, battery
and grid depending on the situation.
All of the breakers and isolators should be on the ON
position and the ByPass Switch should be in the upwards
position ( I ).
BYPASS OPERATION
In the ByPass operation mode, the system will
completely bypass the inverter and the grid will provide
power directly to the EPS loads.
For this to happen, all breakers and isolators should be
turned OFF and the ByPass Switch should be in the
downwards position ( II )
NOTE: The breaker in the switchboard (labelled “BATTERY SYSTEM CIRCUIT BREAKER”) must
always be tuned on.
NOTE: With the BYAPASS SWITCH In the middle position, all EPS circuit will loose power.
How to Operate a SunRise