SunRise – Installation Manual
RE_PROD_0005 Version 3
Page 18 of 28
Issue Date 16/11/2020
Step 6.
Commissioning
The SunRise is commissioned and tested in RedEarth’s factory to guarantee correct operation of
the system as ordered. However, last-minute parameter adjustments may be required (eg. Export
limitation). Carefully follow the procedure in Chapter 8 of the Sungrow User Manual on how to make
these alterations without compromising the existing configuration.
NOTE
: This must be done by a qualified person.
After successful installation, the LDC screen will display as below. If dashes appear instead of
numbers, the installation is incorrect and must be fixed.
Fan Control Adjustment:
The thermostat is located inside the unit next to the GPO’s. This
automatically starts the fans once the temperature rises above the
set-point. This set-point can easily be adjusted with a small
screwdriver. It is set to 35⁰ Celsius in
the factory.
Installation