22
y
x
4 - UNPACKING
PREPARATION AND UNPACKING
The Compact 14 boiler is delivered complete with all its electrical, mechanical and hydraulic components (excluding the pump kit-
OPTIONAL) and having been tested in the factory:
Remove the cardboard, remove the brackets that secure the boiler to the pallet as well as the polystyrene. To remove the rear bracket
(fig.2) one must remove the three screws “
x
” that secure it to the pallet and the three screws “
y
” that secure it to the boiler.
Figure 1 - Packaging
Figure 2 - Rear bracket
removal