RAM-6021 Wired Router
100
Automation Tab
Stop:
Stop
the
DNP3
services,
if
it
is
currently
running.
Start:
Stop
the
DNP3
services,
if
it
is
currently
running
and
start
them
back
up.
Refresh:
Reload
the
DNP3
configuration
file
into
the
text
box.
2.6.5
I/O
Settings
2.6.5.1
Test
I/O
Test
I/O
is
used
to
verify
the
functionality
of
I/O
states
in
gateways,
RTUs
and
I/O
modules.
From
the
navigation
menu
select
Automation>I/O
Settings>Test
I/O
and
you
will
see
this
screen:
•
Click
on
the
Test
I/O
Link
in
RED
and
you
will
be
directed
to
the
following
dialog
window: