Rev: 2014.11.04.v001a
32
Check to make sure that it is square
and straight
Locate the 4 Side Force Generators and
cut them free of each other
NOTE - The larger one will install in the
outer most position. They are "keyed"
so they will only go together one way
Use Welders wet method and mount as
shown
Make sure they are fully seated and
square to the wing. Repeat for the other
side
Locate the parts for the T-Canalizer