42
SAFETY CHECKS AND ADJUSTMENTS
Readings Or Checks By Boiler Number
STEP DESCRIPTION
1 2 3 4 5
1
Low water cut off
2
Low gas pressure
3
High gas pressure
4
Operator okay and set @:
5
High limit okay and set @:
6
Blocked fl ue switch drops out at ("W.C."):
7
Flame fail time:
8
With fan running: Record air box pressure "W.C."
9
With fan running: Record back pressure "W.C."
COMMISSIONING THE UNIT
Readings Or Checks By Boiler Number
STEP DESCRIPTION
1 2 3 4 5
1
Remove manometers and replace plugs
2
Complete this start up form for rep
3
Fill out factory start up form (w/boiler)
4
Correct each boiler’s settings sticker:
5
Replace all covers (no air leaks):
6
All valves opened and adjusted:
7
Boiler pump is running
8
Final operator setting:
9
Final high limit setting:
10
Boiler left in operation:
11
Boiler to require return visit:
12
End user instructed on operation:
13
Contractor instructed on operation:
14
15
16
Start up report and procedure completed by: (please print)
From (company name)
Phone
#:
AUTHORIZED
TECH’S
SIGNATURE:
Date:
Notes/Comments: