Table 3 – Category III Equivalent Length Per Fitting

DIRECT VENT, 

POSITIVE PRESSURE, CATEGORY III

In this configuration the boiler/water heater blower is used 
to push the flue products to the outdoors while drawing 
combustion air from the outdoors. The equivalent length  
of the vent system must  not exceed 

60 ft.

,  18.3 m. The 

Intake

 

Air Option instructions under the “COMBUSTION 

AIR &

 

VENTILATION” section must be followed! The vent 

system must be sized per Figure 2, Outlet Sizes. 

Horizontal Direct Vent Systems – Figures 3 & 4

 

The vent materials used in horizontal vent systems must  
be certified to UL 1738 for installations in the United States, 
ULC S636 for installations in Canada. The certified vent 
terminal from RBI must also be used. 

The maximum equivalent length for the horizontal vent  
pipe is

 60 ft

,

 

18.3 m. If any part of a single wall 

metal vent system passes through an unheated 
space, it must be insulated with insulation rated for 

 

400°F

204°C. Structural penetrations must be made using  

approved fire-stops. For best results, horizontal vent 
systems should be as short and straight as possible.

The vent system must be both gas tight and watertight. All  
seams and joints in metal pipes must be joined and sealed  
in accordance with the vent system manufacturer’s 
instructions.

When horizontal vent runs exceed 

5 ft

1.5 m they must be 

supported at 

3 ft

0.9 m intervals with overhead hangers. 

The vent system must be pitched down, toward the vent 
terminal, 

1/4 in/ft

20 mm/m.  If any part of a single wall metal  

vent system passes through an unheated space it must be 
insulated with insulation rated for 

400°F

204°C.

Horizontal vent systems shall terminate at least 

4 ft

 

1.2 m below, 

4 ft

,  1.2 m horizontally from or 

1 ft

 

0.30 m above any door, window or gravity air inlet into 
any building. It must not terminate less than 4 ft,  1.2 m 
horizontally from, and in no case above or below, unless  

4 ft

1.2 m horizontal distance is maintained, from electric 

meters, gas meters, regulators and relief equipment and 
not less than 

7 ft

2.1 m from any adjacent public walkway. 

The bottom of the vent terminal(s) shall be located at 
least 

5 ft

,  1.5 m above the air intake terminal(s) unless 

there is a minimum 

5 ft

,  1.5 m horizontal separation 

between them. Avoid terminal locations likely to be affected 
by winds, snowdrifts, people and pets. Protect building 
materials and vegetation from degradation caused by the  
flue gases.

Vertical Direct Vent Systems – Figure 5

The maximum equivalent length for the vertical pipe is 

 

60 ft

,  18.3 m. If any part of a single wall metal vent 

system passes through an unheated space, it must be 
insulated with insulation rated for 

400°F

204°C. Structural 

penetrations must be made using approved fire-stops.

An approved nonrestrictive intake air teminal must be  
used. The top of a vertical vent system must extend at least 

5

1

/

2

 ft

,

 

1.7 m above the roof surface and maximum snow 

line that it passes through, 

4 ft

1.2 m above the intake air 

terminal, see Figure 5.

In addition the vent system must conform to the dimensions 
shown in Figure 5. The penetration point in the roof must  
be properly flashed and sealed.

The vent system must be gas tight. All seams and joints  
in metal pipes must be joined and sealed in accordance 
with the vent system manufacturer’s instructions.

Combination Direct Vent Systems – Figure 6

The boiler/water heater can be vented vertically with the  
intake air piped horizontally through an outside wall.  Follow  
the instructions in the Intake Air Option –

 

Horizontal 

Guidelines on page 5.  Also follow the general instructions 
in the “COMBUSTION AIR & VENTILATION” and 
“GENERAL VENTING GUIDELINES” sections.

Model/Outlet

K

Equivalent Feet of Straight Pipe (ft) - Futera II Series

500

6"

750

8"

1000

9"

1250

10"

1500

10"

1750

12"

2000

12"

Standard Tee

1.25  25 ft 35 ft  35 ft  40 ft 40 ft 40 ft 40 ft

Boot Tee

0.65 15 ft 15 ft 15 ft 20 ft 20 ft 20 ft 20 ft

Cap - Low Res (UL) 0.50 10 ft 15 ft 15 ft 15 ft 15 ft 15 ft 15 ft
45° w/Bird Screen

0.40 10 ft 10 ft 10 ft 15 ft 15 ft 15 ft 15 ft

Elbow - 90°

0.38 10 ft 10 ft 10 ft 15 ft 15 ft 15 ft 15 ft

Elbow - 45°

0.15 5 ft

5 ft

5 ft

7 ft

7 ft

7 ft

7 ft

*Equivalent lengths based on listed K-Factors

Summary of Contents for FUTERA II Series

Page 1: ...uction dust and particulate particularly drywall dust will cause contamination of the burner resulting in possible severe personal injury death or substantial property damage The boiler can only be op...

Page 2: ...as Fired Low Pressure Steam and Hot Water Boilers ANSI Z21 56 CSA 4 7 Gas Fired Pool Heaters Canada Only Each unit has been constructed and hydrostatically tested for a maximum working pressure of 160...

Page 3: ...er heater in a location that would restrict the introduction of combustion air into the unit or subject it to a negative pressure see GENERAL VENTING GUIDELINES 6 NEVER place this boiler water heater...

Page 4: ...st be given to the blockage effects of louvers grills and screens Screens must have a minimum mesh size of 1 4 in 6 4 mm If the free area through a louver or grill is not known ducts should be sized p...

Page 5: ...the horizontal combustion air pipe on installations that used the Direct Vent option is 60 ft 18 3 m The maximum equivalent length for the horizontal combustion air pipe on installations that use the...

Page 6: ...61 cm from the center line of the terminal E Clearance to unventilated soffit F Clearance to outside corner G Clearance to inside corner H Clearance to each side of center line extended above meter re...

Page 7: ...3 kW and 100 000 Btuh 30 kW 36 in 91 cm for appliances 100 000 Btuh 30 kW 4 ft 1 2 m below or to side of opening 1 ft 300 mm above opening C Clearance to permanently closed window D Vertical clearance...

Page 8: ...or balcony is fully open on a minimum of two sides beneath the floor NOTES 1 In accordance with the current CSA B149 1 Natural Gas and Propane Installation Code 2 In accordance with the current ANSI Z...

Page 9: ...meters gas meters regulators and relief equipment and not less than 7 ft 2 1 m from any adjacent public walkway The bottom of the vent terminal s shall be located at least 5 ft 1 5 m above the air in...

Page 10: ...10 FUTERA II INSTALLATION AND OPERATION INSTRUCTIONS Figure 1 Air Intake Vertical or Thru Wall Figure 2 Venting Thru Wall Vertical...

Page 11: ...gle or multiple units exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wal...

Page 12: ...AND OPERATION INSTRUCTIONS Figure 5 Vertical Air Intake and Venting for Direct Vent System Figure 6 Combination Direct Vent Systems 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m 1 5 FT...

Page 13: ...venter for the boiler water heater see Table 4 Follow the power venter manufacturer s installation instructions Table 4 Power Venter Sizes VERTICAL CHIMNEY VENT NEGATIVE PRESSURE CATEGORY I The Futer...

Page 14: ...ingle wall vent connection with at least 3 corrosion resistant sheet metal screws Always provide a minimum clearance of 6 in 152 mm between single wall vent pipe and any combustible materials Type B1...

Page 15: ...15 FUTERA II INSTALLATION AND OPERATION INSTRUCTIONS Figure 8 Vertical Venting with a Metal Chimney System...

Page 16: ...r window or gravity air inlet into any building and at least 3 ft 1 m from any overhang unless local codes dictate differently Avoid locations where wind deflection off of adjacent walls buildings or...

Page 17: ...marche Suivre les instructions d allumage R gler le thermostat de fa on que l appareil fonctionne de fa on continue e Test for spillage at the draft hood relief opening after 5 minutes of main burner...

Page 18: ...water mix that prevents foaming Air entrapped within foam significantly decreases heat transfer and can result in damage to the heat exchanger Products such as DOWFROST DOWTHERM UCARTHERM or an equiva...

Page 19: ...4 C The adjustable pump delay turns the pump on each time the burner fires and runs the pump for 6 to 600 seconds after the call for heat is satisfied CAUTION A temperature rise outside of the range...

Page 20: ...econdary systems In order to prevent boiler s short cycling the system flow must be equal to or higher than the boiler s local flow Low Return Water Temperatures To prevent the problems associated wit...

Reviews: