background image

2

MagCore® HF48

Model

HF48 / MCA4801 (under development) 

Processing Capacity

Max  48 samples per batch

System Feature

1  Special Cartridge rack, T-Rack, Tube Rack design for easy installation 

2  Auto-cartridges locking

Power Supply

Voltage: AC 200V ~ 220V;  Frequency: 50/60Hz; 

Dimension

W1000 x D800 x H1600 (mm)

W39 37 X D31 49X H62 99(inches)

Net Weight 

250kg / 551 25Lb

Specification

━ Operation Parameters

━ Operation Environment

━ Applications

Whole Blood (200/400ul), Viral Nucleic Acid (DNA/RNA), Tissue Genomic DNA, Plant Genomic DNA 

Bacteria  Kit, Total RNA  Kit 

Processing Capacity

  1~48 samples per batch

Sample Volume

60/100/150/200 μl /1200 μl 

Elution Volume

60/100/150/200 μl 

Purity

O D  1 8 -2 0 A

260

/

280

 ratio

Temperatures allowed during transportation storage  packaging

  15° C~35° C

Temperatures allowed during operation

+18° C to +30

0

C

Pollution Degree

Indoor  

Summary of Contents for MagCore HF48

Page 1: ...llCartridge 7 TouchPanelandUserInterface 8 MainMenu 8 PanelFunctionalArea 8 EmergencyStopandWarning 9 Start 10 LoadProgram 11 SavePrograms 12 DeletePrograms 12 UpdateProgramFiles 13 EasyMaintenance 13...

Page 2: ...11 GroundingorPolarization Thisproductmaybeequippedwithapolarized alternating current line plug a plug having one blade wider than the other This plug will fit into the power outlet only one way This...

Page 3: ...99 inches NetWeight 250kg 551 25Lb Specification OperationParameters OperationEnvironment Applications Whole Blood 200 400ul Viral Nucleic Acid DNA RNA Tissue Genomic DNA Plant Genomic DNA Bacteria Ki...

Page 4: ...50 Tip TipHolderSetX 50 Elution Carrier X 1 CartridgeCarrierB X 1 CartridgeCarrierA X 1 TipCarrierB X1 TipCarrierA X1 PowerCord X1 Lubricant X1 O RingX 24 Systemtesttoolsshouldbekeptincleanplacesandth...

Page 5: ...n Area Shutter Fixed Stands four legs Fixed Bolt on the Top Cover of Part Chamber SystemOverview Cooling Fans Power Switch and Plug Power Switch red Light Switch green Part Chamber Maintenance Cover S...

Page 6: ...e for system installationandventilationbeforeinstallation When installation the system please make sure the elevation difference by using level rail for measurement and fixed stands forfine tuning Sys...

Page 7: ...egroundlevel andtightenfixedscrews Shearthetransportationbeltandreturnthetopcoverofpart chamber ShearthebeltsonRacks Plugthepowercordandturnonthemainpower Turnonthepower red andthesystemwillbeinitiali...

Page 8: ...ect usemay causethesystem inoperablebecauseCarrier isnot detected InstallCartridge Install Tip and SampleTube B A InsertTipandSampleTubeintotheslotsofTipCarrier Afterthat placetheentiresetofTipCarrier...

Page 9: ...rial number error Setup Systemtimesetup Start Stop Save Back Load Program Start 24 Test 48 Test DNase I Treatment Sample Volume Elution Volume Please select Cartridge Code Elution Buffer Optical Detec...

Page 10: ...e RemoveDNA SampleVolumn ElutionVolumn ElutionBuffer 48 105PlasmaDNAExtractionKit 1 2ml 200 l 150 l A A B B E D Warning Abort Program Stopped Press ABORT to terminate the process or CONTIUNE to run Co...

Page 11: ...Sample Volume Elution Volume Please select Optical Detrction Optical Detection Save Back Load Program 101 MagCore Genomic DNA Whole Blood Kit Speedy installation Start Yes No 48 Test Test CartridgeCo...

Page 12: ...red Program 3 Stored Program 4 Stored Program 5 Stored Program 6 Stored Program 7 Stored Program 8 Load Program Yes No 48 Test CartridgeCode RemoveDNA SampleVolumn ElutionVolumn ElutionBuffer 105Plasm...

Page 13: ...1 2ml 200 l 150 l Start Stop Save Back Load Program Start 24 Test 48 Test Cartridge Code Dnase Treatmen Elution Buffer Sample Volume Elution Volume A B D A B E Please select Channel Youmaydeleteyourco...

Page 14: ...ack UV Sterilization Moving Test Heater Test Rejection Tip Piston Test O Ring Piercing Needles DC Motor Operate Update Program Files EasyMaintenanceisforuser smaintenanceitems includingsystemssuchas s...

Page 15: ...ings Step 2 Applywithnewone Replace O Rings Clean Piercing Needles Start Stop O Ring Piercing Needles Select item and Press Start to run Back Finish Replace O Rings Step 3 Usesuppliedlubricatingoil to...

Page 16: ...horizontalorthereisaloweringsituation pleasepress Finishtotestagain Iftheproblemhappenscontinuously please refertopage14toreplacenewO RingforproblematicPiston andtestthisitemagainafterreplacement Ifth...

Page 17: ...Program Files HeaterTest Start Stop Heater Test Press START to run Back HeaterA 65 C 148 F Heater B 65 C 148 F Thisfunctionismainlyforthesystemtoperformrejectionafter emergencystoporoperationinterrup...

Page 18: ...Update Program Files Start Stop 30min 60min UV Sterilization select Item and press START to run Back 30 00 Remaining Time Complete Back UVSterilization Openthetopcoverofthepartchamber ApplynewUVlamp S...

Page 19: ...jection Tip Piston Test O Ring Piercing Needles DC Motor Operate Update Program Files Maintenance Please select Item Back UV Sterilization Moving Test Heater Test Rejection Tip Piston Test O Ring Pier...

Page 20: ...0 Q W E R T Y U I O P Backspace Enter A S D F G H J K L Z X C V B N M System Timing Setting Start Maintenance Loadprogram Setup Status 2012 06 07 12 12 12 Time Setting Back Year 2012 24 h Hour 12 Minu...

Page 21: ...p Operating Time Hr 00 Min 00 Sec 00 UI Software Ver Ver SUPER2012 0 1 PLC Software Ver Ver SUPER2012 0 1 Machine serial number Error history list UV Time Reset Status Back System Date 2012 12 12 Syst...

Page 22: ...Choosethecorrespondingslotofyoursampleandscanyour sample scode afterthecompletioncodeisdisplayedonthe touchpanel placethesampleintotheslot ifyouhavemorethan onesample pleaserepeattheabovebarcodescanni...

Page 23: ...ystem test and check liquid levels of each columnareatthesamehorizontal Liquidleveloversuctionfilter 1 Wrongsamplematerials 2 Wrongsampletubes 1 PleaserefertoMagCore kitmanual 2 Pleaseusetheprovidedsa...

Page 24: ...TEL 886 2 8912 1200 FAX 886 2 8912 1300 3F No 132 Ln 235 BaoqiaoRd XindianDist NewTaipeiCity23145 TAIWAN http www rbcbioscience com...

Reviews: