![Razorgage Cyclone Operation Manual Download Page 14](http://html.mh-extra.com/html/razorgage/cyclone/cyclone_operation-manual_792156014.webp)
11
Installation of machine
Install saw with enough free space to conveniently allow workpiece to be
brought into saw. If infeed and or outfeed is required allow room for such. The
floor should be a flat non-slip surface. The saw will be more stable if bolted to
floor. After locating the saw use leveling feet to adjust level of saw table.
Place level on saw table and adjust feet to bring table into level position.
Leveling feet
The operator must remove from and
lock out all power to saw before
servicing or connecting power.
DANGER
Summary of Contents for Cyclone
Page 2: ...1 ...