background image

Project Name / Date 

 

5

 

3.1 INSTALLATION 

A.  Must comply with:  

1.  Local, state, provincial, and national codes, laws, regulations and ordinances 
2.  National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition 
3.  National Electrical Code, ANSI/NFPA 70 – latest edition 
4.  Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1, 

when required 

5.  Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I 
6.  Manufacturer’s installation instructions, including required service clearances and venting 

guidelines 

B.  Manufacturer’s representative to verify proper and complete installation. 

3.2 START-UP 

A.  Shall be performed by Raypak factory-trained personnel. 

B.  Test during operation and adjust if necessary: 

1.  Safeties (2.2 - F) 
2. Operating 

Controls 

(2.3) 

3.  Static and full load gas supply pressure 
4.  Gas manifold and blower air pressure 

C.  Submit copy of start-up report to Architect and Engineer. 

3.3 TRAINING 

A. Provide 

factory-authorized 

service representative to train maintenance personnel on procedures 

and schedules related to start-up, shut-down, troubleshooting, servicing, and preventive 
maintenance. 

B.  Schedule training at least seven days in advance. 

END OF SECTION 

Summary of Contents for Finned Water-Tube Pool Heaters 2072B-2342B

Page 1: ...am C Warranty information D Installation and operating instructions 1 4 QUALITY ASSURANCE A Regulatory Requirements 1 ANSI Z21 10 3 CSA 4 3 2 Local and national air quality regulations for low NOx 0 30 PPM NOx emissions pool heaters B Certifications 1 CSA 2 ASME HLW Stamp and National Board Listed 3 ISO 9001 1 5 HEAT EXCHANGER WARRANTY A Limited ten year warranty from date of installation B Limite...

Page 2: ...ports and slots be capable of quiet ignition and extinction without flashback at the orifice and be manufactured from corrosion resistant titanium stabilized stainless steel with low expansion coefficient 2 The burners will be supplied with a fan assisted clean burning and highly efficient fuel air mixture D Pilot Control System 1 The pool heater s shall be equipped with a 100 percent safety shutd...

Page 3: ... The lightweight high temperature multi piece interlocking ceramic fiber combustion chamber liner shall be sealed to reduce standby radiation losses reducing jacket losses and increasing unit efficiency J Venting 1 When routed vertically the pool heater s flue material and size shall be in accordance with the National Fuel Gas Code ANSI Z223 1 NFPA54 latest edition Category I 2 When routed horizon...

Page 4: ...un system shall be completely wired and mounted at the factory 5 The control shall have the following diagnostic LED s a Call for heat b Start up mode c Inlet temperature error d Sensor out of range 6 The controller shall have the capability to add optional alarm contacts P Low Gas Supply Pressure Manifold 1 The pool heater s shall be CSA certified for full input operation down to 4 0 inches W C d...

Page 5: ...rvice clearances and venting guidelines B Manufacturer s representative to verify proper and complete installation 3 2 START UP A Shall be performed by Raypak factory trained personnel B Test during operation and adjust if necessary 1 Safeties 2 2 F 2 Operating Controls 2 3 3 Static and full load gas supply pressure 4 Gas manifold and blower air pressure C Submit copy of start up report to Archite...

Reviews: