9
Raypak Advanced Design Boilers are design certified by AGA/CGA
for outdoor installation. Roof water drainage must be
diverted away from boilers installed under overhangs.
TABLE 2
OUTDOOR INSTALLATION MINIMUM CLEARANCES
Boiler Size
Boiler Side
751, 1001, 1501
Rear
6"
Right
36” (Water side)
Left
36"
Top
0"
Vent
1"
WARNING:
Combustion air inlet (blower air inlet) should have 6" minimum clearance from any obstruction, i.e. walls or
other appliances.
Summary of Contents for 1001
Page 6: ...6 FigureA 1 ADVANCED DESIGN BOILER COMPONENT LOCATIONS...
Page 15: ...Figure E 2b SINGLE BOILER PRIMARY SECONDARY PIPING WITH CHX 15 Figure E 3a DUAL BOILER PIPING...
Page 21: ...Figure G 3a DOUBLE BOILER POOL APPLICATION 21...
Page 53: ...53 Figure L 2 WIRINGDIAGRAM...
Page 58: ...58 Figure O 1 COMPONENTAND PRESSURE TAP LOCATIONS Blower T fitting detail...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ......