25
MAKING THE ELECTRICAL CONNECTIONS
Refer to Fig. I-2 Wiring Connection, and Fig. L-2 Wiring Diagram.
1.
Verify circuit breaker is properly sized by referring to boiler rating plate. A dedicated motor duty circuit breaker should
be provided.
2.
Turn off all power to the boiler. Verify that power has been turned off by testing with a volt-ohm meter prior to
working with any electrical connections or components.
3.
Observe proper wire colors while making electrical connections. Many electronic controls are polarity
sensitive. Components damaged by improper electrical installation are not covered by warranty.
4. Provide an external surge suppressor capable of maintaining system integrity.
5. Provide overload protection and a disconnect means for equipment serviceability as required by local and
state code.
6. Install boiler controls, thermostats, or building management systems in accordance with the applicable
manufacturer’s instructions.
7. Conduit should not be used as the ground. There must be a solid wired ground.
NOTICE:
A grounding electrode conductor shall be used to connect the equipment grounding conductors,
the equipment enclosures, and the grounded service conductor to the grounding electrode.
Figure I-2
FIELD WIRING CONNECTION
Summary of Contents for 1001
Page 6: ...6 FigureA 1 ADVANCED DESIGN BOILER COMPONENT LOCATIONS...
Page 15: ...Figure E 2b SINGLE BOILER PRIMARY SECONDARY PIPING WITH CHX 15 Figure E 3a DUAL BOILER PIPING...
Page 21: ...Figure G 3a DOUBLE BOILER POOL APPLICATION 21...
Page 53: ...53 Figure L 2 WIRINGDIAGRAM...
Page 58: ...58 Figure O 1 COMPONENTAND PRESSURE TAP LOCATIONS Blower T fitting detail...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ......