
50
SECTION L CONTROLS
WARNING:
Installation, adjustment and service of boiler controls including timing of various operating
functions must be performed by a qualified installer or service agency. Failure to do so may result in
control damage, boiler malfunction, property damage, personal injury, or death.
WARNING:
Turn off the power to the boiler before installation, adjustment or service of the Central Point Wiring
board or any boiler controls. Failure to do so may result in board damage, boiler malfunction,
property damage, personal injury, or death.
CAUTION:
This appliance has provisions to be connected to more than one (1) supply source. To reduce the risk
of electric shock, disconnect all such connections before servicing.
CAUTION:
Risk of electric shock. More than one (1) disconnect switch may be required to de-energize the
equipment before servicing.
CENTRAL POINT WIRING (CPW)
Central Point Wiring is an advanced control integration technique that provides complete boiler diagnostic capability
and greatly simplifies troubleshooting. At the heart of CPW is the Operations Status Center, which is comprised of two
different circuit boards: the CPW board and one or more U-2 Diagnostic Boards.
THE CPW BOARD
The Central Point Wiring (CPW) board serves as the central tie point for connecting all other control components in the
boiler. The CPW board provides boiler operating status and fault indication using eight LEDs which function as described
in Table L-1
Table L-1 CPW Board LED Indicators
Light
Color
Indication
Power
Green
24 VDC is applied to the system
System Error
Red
Overload current on the board. Board is disabled.
Pump
Green
Boiler Pump is energized.
Pilot
Yellow
Power applied to the Pilot Gas Valve. (PV signal on.)
Main Gas
Green
Power applied to Main Gas Valve. (MV signal on.)
Call for Heat
Green
Thermostat is closed. Call for heat present.
Service
Red (Flashing)
One or more of the safeties are open. Refer to U-2 Board
Blower
Green
Blower is energized.
Summary of Contents for 1001
Page 6: ...6 FigureA 1 ADVANCED DESIGN BOILER COMPONENT LOCATIONS...
Page 15: ...Figure E 2b SINGLE BOILER PRIMARY SECONDARY PIPING WITH CHX 15 Figure E 3a DUAL BOILER PIPING...
Page 21: ...Figure G 3a DOUBLE BOILER POOL APPLICATION 21...
Page 53: ...53 Figure L 2 WIRINGDIAGRAM...
Page 58: ...58 Figure O 1 COMPONENTAND PRESSURE TAP LOCATIONS Blower T fitting detail...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ......