
•
Horizontal Thru-wall Direct Venting System With Add-on Condensing Heat Exchanger
(Category IV) Installation
These installations utilize the boiler mounted blower to draw combustion air from outdoors and vent combustion products
to the outdoors.
UL 17-38 Certified Venting Material (e.g. AL29-4C) MUST be used. The vent must be installed to prevent the flue gas
leakage. Care must be taken during assembly to insure that all joints are sealed properly and are airtight.
For certain installations, i.e. pool, heat-pump, domestic hot water supply with pre-heat tank, PVC or CPVC may be used.
Contact manufacturer for details.
To prevent condensate accumulation in the vent, it is required to install the horizontal portion of vent with a slight upward
slope of not more than 1/4" per foot of horizontal run and an approved condensate trap must be installed per applicable
codes.
WARNING:
For common vent installations contact factory.
WARNING:
No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the
safety and health of inhabitants.
The Stainless Steel non-restricted direct vent cap must be furnished by the boiler manufacturer in accordance with its
listing.
45
Summary of Contents for 1001
Page 6: ...6 FigureA 1 ADVANCED DESIGN BOILER COMPONENT LOCATIONS...
Page 15: ...Figure E 2b SINGLE BOILER PRIMARY SECONDARY PIPING WITH CHX 15 Figure E 3a DUAL BOILER PIPING...
Page 21: ...Figure G 3a DOUBLE BOILER POOL APPLICATION 21...
Page 53: ...53 Figure L 2 WIRINGDIAGRAM...
Page 58: ...58 Figure O 1 COMPONENTAND PRESSURE TAP LOCATIONS Blower T fitting detail...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ......