![Raymarine ST70 Instrument User'S Reference Manual Download Page 29](http://html2.mh-extra.com/html/raymarine/st70-instrument/st70-instrument_users-reference-manual_3927109029.webp)
Chapter 2: Commissioning Procedures
23
2.3 Return to normal operation
When you have completed all the appropriate dockside setup and seatrial calibration
procedures, return to normal operation as follows:
1. With the Transducers found menu displayed, press
CANCEL
to select the
Search
Results
screen.
2. Press
CANCEL
to select the
Transducer Setup
screen showing the search
initiation message.
3. Press
CANCEL
to select the
Advanced options
menu.
4. Press
CANCEL
to select the
Main Menu
.
5. Press
CANCEL
to return to normal operation.
2.4 After commissioning
When the dockside setup and seatrial calibration have been completed, and you have
returned to normal operation, your ST70 instrument is ready for use. Refer to the
ST70 Operating Guide
for instructions on how to use it on a day-to-day basis.
EMC Conformance
Always check the installation before going to sea to make sure that it is not affected by
radio transmissions, engine starting etc.
81284_1.book Page 23 Friday, May 4, 2007 7:29 AM
Summary of Contents for ST70 Instrument
Page 1: ...ST70 Instrument User Reference Manual Document reference 81284 1 Date June 2007...
Page 30: ...24 ST70 Instrument User Reference Manual...
Page 34: ...28 ST70 Instrument User Reference Manual...
Page 42: ...36 ST70 Instrument User Reference Manual...
Page 44: ...38 ST70 Instrument User Reference Manual...