Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the
manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code
of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the scheme. Visit
www.centralheating.co.uk for more information.
THE BENCHMARK SCHEME
4
Summary of Contents for 680KCD C
Page 9: ...Cleaning 9 Fig 6 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE ...
Page 22: ...22 Fig 31 DESN 514774 Replacement of parts Electrical controls ...
Page 23: ...23 Fault Finding Fig 32 Rayburn 600 700 Wiring Diagram 111MB for Individual Satronic boxes ...
Page 29: ...Fault Finding 29 Fig 34A DESN 516838 ...
Page 30: ...30 Fault Finding ...
Page 31: ...31 Fault Finding ...
Page 33: ...33 ...
Page 34: ...34 ...
Page 35: ...35 ...