Installation: Cable Installation
17
INSTALLATION
FIGURE 12. RS1 Tee Cable 6-Pin Connectors
6. Disconnect the two 6 pin Deutsch connectors.
7. Connect the mating 6 pin Deutsch connectors on the VSN Visual Guidance cable (P/N 115-2020-012) labeled
“TO RS1 Tee Cable” to the 6 pin Deutsch connectors on the RS1 tee cable.
FIGURE 13. VSN Visual Guidance Cable Connected to RS1 Tee Cable
8. Route the 23 pin connector on the VSN Visual Guidance cable, PN 115-2020-012, towards the front of the
machine where the VSN Visual Guidance assembly is installed.
Summary of Contents for VSN
Page 4: ...Table of Contents ii VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 8: ...CHAPTER 1 4 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 12: ...CHAPTER 2 8 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 26: ...CHAPTER 3 22 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 28: ...Index 24 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...