CHAPTER 3
16
VSN Installation Manual for RBR Vector Ventuir/Vortex, MY18+
CABLE INSTALLATION
OUTSIDE OF CAB
1. Identify the VSN Visual Guidance cable (P/N 115-2020-012)
2. Locate the cab access panel in the right rear corner of the machines cab.
FIGURE 11. Cab Access Panel
3. Remove the panel cover.
4. Locate RS1 tee cable (P/N 115-4010-068 or P/N 115-4010-096) which is connected to the bulkhead connector
labeled “Raven”.
NOTE:
If the machine is equipped with a bed that utilizes CAN ECUs (L4000 or CaseIH Flex Air), you will have
a 115-4010-068 cable.
If the machine is equipped with a bed that utilizes ISO ECU’s (L4500, L5000, Salford, or Vortex liquid
skid), you will have a 115-4010-096 cable.
5. On the RS1 tee cable, locate the two, 6 pin Deutsch connectors that are plugged together.
NOTE:
If machine is equipped with RS1 tee cable (P/N 115-4010-068), the cable revision level will need to be
Rev. D or higher.
If the machine is equipped with RS1 tee cable (P/N 115-4010-096), the cable revision level will need to
be Rev. B or higher.
Summary of Contents for VSN
Page 4: ...Table of Contents ii VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 8: ...CHAPTER 1 4 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 12: ...CHAPTER 2 8 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 26: ...CHAPTER 3 22 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...
Page 28: ...Index 24 VSN Installation Manual for RBR Vector Ventuir Vortex MY18 ...