background image

Manual No. 016-0171-598 Rev. B

5

Initial Hawkeye Configuration

1. Press the VT Menu button.

2. Walk through all of the steps in the setup wizard. For this you will need the 

following information: 

Note:  If, at any point during the setup wizard you have a question, press the 

??? button by the item for more information.

3. Press the tools button.

Number of Nozzle Control Valves

Applicator Type

Nozzle Spacing

Tip Size

Fence Rows (if needed)

Number of Sections

Section Widths

Boom Offset

Switch Mapping (if needed)

Boom Pressure Calibration

Valve Calibration

Flow Meter Calibration

Target Rate

Target Pressure

Summary of Contents for Hawkeye

Page 1: ...1 016 0171 598 Rev B 05 17 E29361 Copyright 2017 Hawkeye Quick Start Guide...

Page 2: ...modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availab...

Page 3: ...Manual No 016 0171 598 Rev B 1 Contents Overview 2 Requirements 2 Machine Configuration 2 Initial Hawkeye Configuration 5 Finalizing Machine Configuration 6 Additional Information 7...

Page 4: ...ration If this is the first time using a Viper 4 on this machine 1 Power on the Viper 4 At Raven Industries we strive to make your experience with our products as rewarding as possible One way to impr...

Page 5: ...3 2 Select the desired language from the drop down menu 3 Read the end user License Agreement 4 Press OK to accept A New Machine Configuration Detected Window will open 5 Press OK The Please Select a...

Page 6: ...ne from the machine database do not select one of the standard boom configurations The boom setup will be setup during the Initial Hawkeye Configuration process 8 Select the machine Type Sub Type Manu...

Page 7: ...If at any point during the setup wizard you have a question press the button by the item for more information 3 Press the tools button Number of Nozzle Control Valves Applicator Type Nozzle Spacing Ti...

Page 8: ...view and information on the second Calibration Summary page Any adjustments to these settings must be done through the machine settings 7 Press Previous Page 8 Press Calibrate NCVs The NCV calibration...

Page 9: ...without any additional information from the user If asked to name the boom group and enter the number of sections stop the configuration process Exit out of the boom group configuration cycle power on...

Page 10: ...8 Hawkeye Start Up Guide...

Page 11: ...Industries Do Bring the defective part and proof of purchase to your Raven dealer If the dealer approves with the warranty claim the dealer will process the claim and send it to Raven Industries for f...

Page 12: ...ciated equipment or products and will not be liable for loss of profit labor or other damages Cables hoses software enhancements and remanufactured items are not covered by this Extended Warranty The...

Reviews: