INSTALLATION AND PREPARATION
POINT OF INJECTION INSTALLATION
Review the following steps for information on installing the point of injection assembly into the existing carrier
product line on the implement.
1. Select a point in the carrier product line in which the point of injection plumbing assembly may be installed in
section on page 8 for more information on considerations
for the location of the point of injection.
NOTE:
Use the point of injection assembly to “layout” or help determine the best installation location. The
point of injection should be as close to the Force
®
Evo injection cabinet as possible to help reduce
the amount of chemical wasted when flushing the injection system.
2. Install the point of injection assembly so that carrier product flow through the 1” check valve and 1” mixer
follows the arrows formed on the check valve and mixer assemblies. Be sure to use pipe sealant on the check
valve and mixer threads.
3. If necessary for your implement or the existing plumbing, secure the point of injection assembly to an integral
implement frame using appropriate hardware.
3-WAY VALVE AND FINAL PLUMBING PROCEDURE
The 3-way valve provided with the Force
®
Evo system is required for proper flushing and winterizing of the
Force
®
Evo injection system and allows the operator to properly dispose of chemicals more easily. Review the
following steps for more information and assistance with installation of the 3-way valve and final plumbing
connections for the Force
®
Evo injection system.
NOTE:
Use pipe sealant (not supplied) on all fittings. Tighten all fittings with a pipe wrench as instructed.
1. Select a location for the 3-way valve (item 2) used with the Force
®
Evo system. The valve should be located as
close to the point of injection as possible within easy reach of the operator.
NOTE:
Keep all hose lengths as short as possible to reduce the amount of chemical waste when flushing or
winterizing the system.
2. Thread the supplied 3/8” hose barb fitting (item 3) into the 3-way valve port opposite of the valve handle.
Tighten the fitting.
3. Thread the supplied hose barb elbow fittings (item 1 and item 4) into the through ports on the 3-way valve as
shown and tighten. The 3/8” hose barb fitting goes toward the 3/8” hose barb fitting at the point of injection.
4. Place two hose clamps over the supplied and press the hose onto the 3/8” hose barb elbow.
5. Place and tighten the hose clamps to secure the hose to the hose barb.
6. Place two hose clamps over the remaining hose and press the hose onto the 1/2” hose barb fitting installed in
the inlet branch of the 3-way valve.
7. Place and tighten the hose clamps to secure the hose to the hose barb.
8. Route the hose to the outlet of the 1/2” check valve at the injection pump.
9. Place the hose clamps over the 3/8” hose and press the hose onto the pump calibrator outlet port.
10. Place and tighten the hose clamps to secure the hose to the hose barb.
NOTE:
It will be necessary to know the length of hose used between the injection pump outlet and point of
injection. Measure and record the hose length for use when setting up for field operations.
Summary of Contents for Force Evo
Page 1: ...Copyright 2019 Force Evo Injection System Installation Manual 016 0171 724 Rev A 12 20 E36393 ...
Page 4: ...Table of Contents ii Force Evo Injection System Installation Manual ...
Page 10: ...CHAPTER 2 6 Force Evo Injection System Installation Manual ...
Page 22: ...CHAPTER 4 18 Force Evo Injection System Installation Manual ...
Page 30: ...CHAPTER 5 26 Force Evo Injection System Installation Manual ...