016-0236-001 Rev. E
31
SENSOR INSTALLATION
CENTER RACK ROTARY SENSOR INSTALLATION
120’ STEEL BOOM AND 120’, 132’, AND 135’ ALUMINUM BOOM
1. Locate the open position between the center rack and center frame to mount the rotary sensor.
FIGURE 10. Center Rack Rotary Sensor Assembly for 120’ Booms
2.
Assemble the items in above figure to the rotary sensor assembly labeled “Center Rack” as shown
.
FIGURE 11. Rotary Sensor Installation Location on Center Rack
Rod
Ends
M6 Nylock Nut
M6 Jam Nut
Threaded Rod
M6 Jam Nut