![Raven AutoBoom Case IH Patriot 2240 Installation Manual Download Page 39](http://html.mh-extra.com/html/raven/autoboom-case-ih-patriot-2240/autoboom-case-ih-patriot-2240_installation-manual_788960039.webp)
Index
P/N 016-0230-047 Rev. C
35
E
Electrical Safety
3
G
Gauge Wheel Installation (Optional)
25
Gauge Wheel Mounting Locations
25
Mounting the Gauge Wheels
25
H
Hydraulic
Fittings
6
Hydraulic Safety
2
Hydraulic System
Installing the Fittings on the AutoBoom Valve
14
Installing the Left and Right Cylinder Hoses
16
Installing the Left and Right Down Hoses
17
Installing the Pressure and Tank Hoses
15
Mounting the AutoBoom Valve
14
I
Important Safety Information
Electrical Safety
3
General 3
Instructions for Wire Routing 3
Hydraulic Safety
2
General 2
Instructions for Hose Routing 2
Introduction
5
Updates
6
K
Kit Contents
7
P
Point of Reference
6
Preparing for Installation
5
R
Recommendations
5
Replacement Parts
Sensors
34
Valve Blocks
33
UltraGlide 33
S
Sensor Installation
Mounting the Center Sensor
23
T
Tools Needed
6
U
Ultrasonic Sensor Installation
21
Connecting the Sensor Cables
24
Mounting the Boom Sensors
21
Boom Sensor Mounting Locations 21
Mount the Boom Sensors 22
W
Wiring Installation
27
Connecting the Harness to the AutoBoom Valve
28
Connecting the Harness to the CAN Controls
29
Connecting the Harness to the Sensors
28
Connecting the Left and Right Centering Sensors
30
Connecting the Power Leads
32
Installing the AutoBoom Node
27
Wiring Connections
27