Use and maintenance manual
RBH 150 V - RBH 200 V
Pag.33
Rev.2 14/01/2021
Time and date setting
Below are given the steps for accessing the relative menu.
Press the increase key to change every single value
Press the increase key to change every single value
Press “confirm” to confirm the settings and switch to the next option.
By pressing the key “back” for several times you will display the
stand-by page.
Press the key
“access menu” to
access the
MENU page
Press the key
“confirm”
to access the
USER page
Press the key “selection” for
several times
to go to the second
page of the USER menu
and select
SETTINGS.
Press the key
“confirm” to
access the
SETUP
page
Press the key
“confirm”
to access the
page DATE-TIME
At the end of the auger loading, the display shows 0 “and automatically switches to the USER menu page.
Loading the auger
UNLIKE THE MODELS PROVIDED WITH AUTOMATIC CLEANING DEVICE, IN THIS CASE ALWAYS REMEMBER TO EMPTY THE
GRATE BEFORE TURNING ON THE STOVE AND CHECK THAT ALL ITS HOLES ARE FREE OF OBSTRUCTIONS. NEVER EMPTY
THE GRATE INTO THE HOPPER. FIRE HAZARD.
Below are given the steps for accessing the relative menu.
Carry out this operation to facilitate the first start-up phases of the stove; Also check that pellets have been fed into the tank and wait for the
stove to reach the “SHUTDOWN” or “FINAL CLEANING” status. The the number expressed in seconds indicates the rotation time of the
infeed screw during the first loading cycle. After this time, the infeed screw stops immediately and then pellets are emptied from the grate
before turning on the equipment.
Press the key
“access menu” to
access the
MENU page
Press the key
“confirm”
to access the
USER page
Press the key
“confirm” to enable the
rotation of the infeed screw
Press the key for several times until the Stand-by page is displayed.
MENU
USER
POWER SELECTION
POWER SETTING
CHRONOTHERMOSTAT
SCREW LOADING
SET AIR-PELLET
USER
MANUFACTURER’S
TECHNICIAN
ENABLE EXT. T.
SEASON
CONTRAST
LANGUAGE
ADJUST
FW VERSION
DATE – TIME
MENU
USER
MANUFACTURER’S
TECHNICIAN
USER
POWER SETTING
CHRONOTHERMOSTAT
SCREW LOADING
SCREW LOADING
SET AIR-PELLET
Summary of Contents for RBH 150 V
Page 1: ...MANUALE D USO E MANUTENZIONE RBH 150 V RBH 200 V...
Page 2: ......
Page 54: ......
Page 55: ......
Page 57: ...USE AND MAINTENANCE MANUAL RBH 150 V RBH 200 V...
Page 58: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 113: ...MANUEL D UTILISATION ET D ENTRETIEN RBH 150 V RBH 200 V...
Page 114: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 169: ...BEDIENUNGS UND WARTUNGSHANDBUCH RBH 150 V RBH 200 V...
Page 170: ......
Page 221: ...MANUAL DE USO Y MANTENIMIENTO RBH 150 V RBH 200 V...
Page 222: ......
Page 273: ......
Page 274: ......
Page 275: ......