38
33
31
Side of Unit A
( )
0
0
1
mm
Rear wall to Lined Flue C,
(
I
G,
)
25
mm
Rear wall to Unlined Flu C,
(
)
,
G I
m
m
75
Rear of Unit (H)
0
1 0mm
Rear corners (Corner Installation) (F) 0
1 0mm
Floor protection (from glass) (B)
150mm
2.3
Minimum Clearance to Combustibles
2.4
Location of the Pellet Fire
il
l
e
v
a
R
e
h
t
f
o
n
o
it
a
ll
a
t
s
n
I
Pompeii
Freestanding Wood Pellet Burning Stove should
be undertaken by an experienced installer. Please read
ompeii
P
the
Owners/Technical Manual thoroughly before commencing installation, as failure to follow
2.5
Generally the Pompeii should be installed in a centrally located position within the home.
When deciding where to position the appliance in your room, you need to consider the
following:
2.6
Location of a power source
•
The Pompeii
has a convection fan which blows air across the top of the unit in the
•
The Pompeii
must be installed on a non-combustible surface. This surface must
•
combustible material, also ensure the position of structural elements near the proposed
riveted.
•
Seismic Restraint: Please see “Seismic Restraint” on page 43 for requirements.
•
Warranty: To validate warranty following installation a copy of the completed Warranty/
Producers Statement must be forwarded to:
Pellet
pelletfiresolutions.co.nz
@
e
ri
F
s
n
o
it
u
l
o
S
- o
f
n
i
The Pompeii
has been Safety Tested to AS/NZS 2918:2001 using the Davins
manufactured
Test Report ARS 05/1185
. Installation is not exclusive to these
nominated kits, though alternative
should only be considered following
consultation with your local council.
direction that the fire faces, for optimum performance this location should be in a
large room centrally located.
the instruction could cause damage to the pellet stove or property.
Please see “Clearances & Specifications” on page 37 for the required clearances to
Summary of Contents for Pompeii
Page 14: ...Pull to clean exchanger tube bundle 12 5 8 How to Clean the Tubulators ...
Page 32: ...30 25 Page 16 7 Maintenance Record SIGNATURE WORK CARRIED OUT DATE ...
Page 44: ...42 1 2 x 4 2 12 How to mount the side panels ...
Page 50: ...48 38 4 Maintenance Record DATE WORK CARRIED OUT SIGNATURE 40 ...
Page 52: ......
Page 53: ......