3
E-Z Operation
RAV GTB-16N Tubeless Truck Tire Changer
Demount Instructions
These steps apply to demounting virtually all tire and wheel
combinations.
I. Preparing to Break the Beads
•
Position wheel against chucking unit with demount side
facing operator.
•
Make sure wheel drop center is facing away from the
machine.
•
Chucking unit offers several positions for different size
wheels and thicknesses.
•
Make sure wheel is fitted on chucking unit properly.
•
Clamp wheel and raise chucking unit all the way to top
until it stops.
Raise Chucking Unit All the Way to the Top Before Starting
Mounting Demounting Process
•
Lower the unit to start tire on the rim.
•
Raise the unit all the way to the top to begin mount/
demount process.
II. Breaking Outside Bead
Completely Deflate the Tire Before Breakdown Procedure or
Damage to the Machine Will Occur!
•
Using control box place front roller in proper position against
the bead and about 1” away from the wheel.
•
Rotate the chucking unit to the right (clockwise) and apply
lube to the outer bead...THIS IS CRITICAL.