Commissioning
6
48
Opening the metering slide:
1.
Fully close the metering slide at the control valve
2.
Set the adjustment rate limit stop to maximum.
3.
Fully open the metering slide at the control valve
Hydraulic cylinder is at limit stop.
The return spring is still tensioned.
Figure 6.10:
Metering slide open, hydraulic cylinder at limit stop