
10
ASSEMBLY
1. Assembly after open the carton
NOTICE:
The installed work shall be carried out only by specifically trained personnel.
1.1 Install tires
Install the tires on both side of gearbox drive shaft. Fix them with pin and
shape pin. Make sure the direction of all treads is same as the figure below:
1.2 Install blade sets
Install the blades sets before tilling:
1) Install drag bar
As shown in Fig9, Pull out the pin
ĸ
and the 8
shape pin
ķ
respectively from the hole of
connecting bar, put the drag bar
ĺ
in the seat
Ĺ
of
connecting bar in an order as indicated in the figure
9. Then connect up the drag bar and the connecting
bar
Ĺ
with the pin
ĸ
and fasten the pin with 8
shape pin
ķ
.
Summary of Contents for RG3.6-100Q-Z-II
Page 48: ...93004 U080410 0000...