17
www.ratio-electric.com
1
(L)
(N)
MAINS
2
3
7
. Place the remaining current transformers around the other phase wires of the main power
grid, also between the main fuse and the solar panel connections.
Note:
Make sure the arrows on the current transformers point towards the entry point of the
main power grid.
Note:
It is crucial for the functioning of the charger that you insert the current transformers
into the correct input.
8
. Insert the 3,5 mm jacks of the current transformers to the L2 and L3 input on the
Sensorbox.
1
(L)
(N)
MAINS
2
3
40 mm
9
. Strip the wires of the data cable (not included).
10
. Insert four wires of the data cable into the green terminal block connector.
11
. Secure the wires to the terminals. Use a screwdriver.
12
. Write down the colours and order of the inserted wires of the data cable.