background image

Page 3

Included:

•  2500-__ SPRVSR Supervisor Board(s)

•  4 pair RJ11 pigtail cables (quantity based on 

   model number)

•  12vdc power transformer

Items Needed

1.

 Swing out the Supervisor Board from the mounting bracket by removing the two screws on the left.

2.

 Take the RJ45 pigtail cables provided with the Distribution Module and plug them into the RJ45 jacks on the 

    Distribution Module.

3.

 Use a 110 style punch tool to attach the pigtail side of the the RJ45 harnesses to the punch down blocks on the 

    back of the Supervisor Board. Refer to the wiring diagrams below for the scheme used on the punch down blocks  

    and Distribution Module.

Installation & System Wiring

Not Included:

•  110 style punch tool

•  Distribution Module (sold separately with Command Center 

   Base Station)

•  RJ45 wiring pigtail cables (included with Distribution Module)

POWER IN

RETURN

+ 12VDC

2500-___SPRVSR

ALARM OUTPUT

N.C.

COMM
N.O.

4 Phones 

4 Phones 

4 Phones 

4 Phones 

2 Phones 

3

9

10

11

12

13

14

15

16

17

18

19

20

Flex Ports Can 

be Used for

Outside Phone 

Lines or Call

Stations

For 12-16 zone systems, one Supervisor Board is included. Wire as shown below:

For 28-36 zone systems, two Supervisor Boards are included. Wire as shown below:

POWER IN

RETURN

+ 12VDC

2500-___SPRVSR

ALARM OUTPUT

N.C.

COMM
N.O.

4 Phones 

4 Phones 

4 Phones 

4 Phones 

21 

22 

23

24 

25 

26 

27 

28 

29

30

31

32

33

34

35

36

37

38

39

40

POWER IN

RETURN

+ 12VDC

2500-___SPRVSR

ALARM OUTPUT

N.C.

COMM
N.O.

4 Phones 

4 Phones 

4 Phones 

4 Phones 

3

9

10

11

12

13

14

15

16

17

18

19

20

Supervisor Board 1

Supervisor Board 2

4 Phones 

Flex Ports Can

be Used for 

Outside Phone

Lines or Call

Stations

Note: 

 Do not follow the color scheme on the punch down blocks themselves.

Wiring 12-36 Zone Systems

•  On top of each port there is a label indicating connection:

 

•  

STL

 is the port used for connecting Emergency Phones

 

•  

TWT

 is the port used for connecting outside Telco Lines

•  The first card installed will always be:

 

•  Port 1: (01-04) connection for 4 Emergency Phones (SLT). Connects to Supervisor Board ports 1-4.

 

•  Port 2: (05-06) connection for 2 Telco Lines (TWT). Connects to last Supervisor Board ports 19-20.

12-36 Zone Distribution Module Reference Wiring

Summary of Contents for 2500 SPRVSR Series

Page 1: ...pervisor Board 2500 __SPRVSR Installation Operations Manual N56W24720 N Corporate Circle Sussex WI 53089 800 451 1460 www rathcommunications com RP8500SPRVSR Ver 8 07 20 Made in the USA 3 Year Warrant...

Page 2: ...y assist with site preparation installation and maintenance It is our sincere hope that your experience with us has and will continue to surpass your expectations Thank you for your business The RATH...

Page 3: ...ex Ports Can be Used for Outside Phone Lines or Call Stations For 12 16 zone systems one Supervisor Board is included Wire as shown below For 28 36 zone systems two Supervisor Boards are included Wire...

Page 4: ...4 Phones 4 Phones 4 Phones 4 Phones 4 Phones 4 Phones Flex Ports Can be Used for Outside Phone Lines or Call Stations The second through fifth cards will always be used for connecting additional Emerg...

Page 5: ...Phones 4 Phones 4 Phones 4 Phones 4 Phones Flex Ports Can be Used for Outside Phone Lines or Call Stations Note Do not follow the color scheme on the punch down blocks themselves 56 92 Zone Distributi...

Page 6: ...te The numbering pattern continues on all subsequent cards Depending on the number of zones needed some cards will be left empty and will have no connections S01 S04 S05 S08 S09 S12 2019 2020 2033 203...

Page 7: ...use the 110 style punch down tool to punch down the blue blue white pair on to the number 20 punch down block Then take the orange orange white pair and punch it down on to the number 19 punch down bl...

Page 8: ...bracket or to a 19 rack not included Complete System Connections 1 Plug the power transformer into the power source wall outlet or UPS 2 Ensure the LEDs associated with the connected Supervisor ports...

Page 9: ...bove the port will clear 5 After all errored devices are reconnected the green system status light should illuminate within 3 minutes Typical System Layout Distribution Module 2500 UPS Monitor Fire Co...