Mounting Toilet
Mounting surface must be flat and solid.
IMPORTANT: Do not mount where it may be
subject to shower spray or other sources of
external water.
1. Install seat on toilet.
2. Place toilet where it will be located.
Make sure there is room to route hoses.
Make sure seat will open properly.
3. Mark location of toilet base mounting holes on
mounting surface.
4. Drill holes for toilet mounting bolts/screws.
NOTE: Hole size will depend on type of bolt/screws
used (5/16" [8mm] size bolts/screws are
recommended).
5. Mark locations for hoses where required.
6. Cut holes for hoses.
7. Place rubber mounting strips under base plate.
8. Secure toilet to surface.
Mounting Water Solenoid Valve
(Pressurized Freshwater Models Only)
1. Locate valve on a solid flat surface in an area
that is dry and well ventilated.
2. Mark and drill holes for water solenoid mounting
bracket.
NOTE: Hole size will depend on type of bolts/screws
used (1/4" [6mm] size bolt/screws are
recommended).
3. Mount bracket.
4. Install fittings provided (PLA14) on valve’s inlet
and outlet ports.
5. Attach valve to bracket. Valve must be mounted
according to flow markings on valve body.
INSTALLATION
From
Pressurized
Freshwater
Source
OUT
PLA14
To Crown Head II
IN
8