Free Standing Cartage Tanks by Rapid Spray
Rapid Spray Water Cartage Tank Operators Handbook
6
FRAME DESIGN
Tank warranty is conditional on the tank correctly mounted.
Where applicable mounting may have to be designed and/or approved by an engineer.
Lugs not to
be used to
lift tank
Bottom of tank must
be supported over
full length of tank
Every leg
must be fully
supported
Provide support for
edges of baffle box
M10x75 High Tensile
hold down bolts to
AS1110 (pins must be
bolted down)
Mild steel hold down
pins (supplied)
Lateral stops
on all legs*
Connection to tank
must be made with
flexible hose
*Lateral stops recommended for all tanks 3,000L and larger.